93
NV8500 Series
User’s Guide
3 For each card, press the ejector lever(s) inward, making sure each card is fully seated in its
slot.
4 Close the frame door. The door must be closed for the router cooling system to work prop-
erly.
Installing Monitor Cards in the NV8576-Plus
Follow the procedure for installing monitor cards for the NV8576 for each frame of the NV8576-
Plus (expanded or stand-alone).
Monitor Backplane Locations
NV8144
If you are facing the rear of the router, the monitor’s one backplane slot is just to the left of the
output cards and just to the right of the system connectors. (See Figure 1-5 on page 8.)
NV8280
If you are facing the rear of the router, the monitor backplanes slots at the left end of the output
bay: There are two slots: one for the output monitor backplane and one for the input monitor
backplane. The input monitor backplane is just to the right of the output monitor backplane, as
shown here:
Fig. 5-3: Monitor Backplanes in NV8280
Output Monitor Card
Input Monitor Card
Summary of Contents for NV8500 Series
Page 1: ...NV8500 Series Hybrid Digital Video Audio Routers User s Guide UG0034 09 30 Oct 2014 ...
Page 8: ...viii ...
Page 16: ...xvi Table of Contents ...
Page 124: ...108 Expanded NV8576 Plus Connecting the NV8576 Plus Frames ...
Page 134: ...118 Alarms Making Alarm Connections ...
Page 150: ...134 Power Connecting to Power ...
Page 161: ...145 NV8500 Series User s Guide Network Page Time Page ...
Page 204: ...188 M3 Cards M3 Cable and Connectors ...
Page 216: ...200 Maintenance Obtaining Service ...
Page 228: ...212 IP Gateway Specifications ...
Page 236: ...220 Frame Expansion ...
Page 246: ......