IPU-POD128 build and test guide
3.2 Document reproduction
Ideally you should reference this document from a tablet device to allow you to zoom in on photographs. If you
reproduce this document on paper it should be done in colour otherwise you will not be able to see cable colours
and other notations properly.
3.3 Required tools
You will need the following tools and equipment:
• Pallet truck with wide fork spacing (at least 32cm between forks) and at least 750KG SWL
• Knife suitable for cutting plastic tape
• No 2 Phillips screwdriver
• Torx TX30 screwdriver
• Scissors suitable for cutting Velcro
If you will be re-packaging the rack after building it then you will also need:
• Pallet banding tape, banding clips and banding crimping tool
• Packaging tape
3.4 Preparing the rack
3.4.1 Rail distance
The IPU-M2000 mounting system requires a rail-to-rail distance of 720mm. This document describes the adjust-
ments required for an AR3300SP rack. If using a different rack this rail distance must be observed.