5.1 GENERaL
The flow and return pipework can be routed to either side of the
boiler, dependant on the type and direction of the flue system
used.
For condensate disposal pipework refer to Section 6.
A drain cock is supplied in the accessories pack and should be
fitted at the bottom on the front of the boiler to allow the boiler to
be drained.
Key to diagrams
Key
F
Flow
FP
Flow pipe
FC
Flow connection
R
Return
MB
Mounting bracket
DS
Dual stat
CP
Removable cover plate
P
Pockets
SP
Split pin
5.2 15/21, 21/26 aND 26/35 mODELS
FLOW CONNECtiON
A 1ʺ BSP socket is provided for the boiler flow connection. This is
located on the top of the boiler towards the right hand side. Refer
to Figure 5-1.
The flow pipe from the boiler will need to be vented as it is the
highest point on the primary heat exchanger.
REtURN CONNECtiON
A second 1ʺ BSP socket is provided for the boiler return
connection. This is located on the top of the boiler towards the
front on the right hand side. Refer to Figure 5-1.
The return pipe to the boiler will also need to be vented as it is the
highest point on the secondary heat exchanger.
Figure 5-1:
15/21, 21/26 and 26/35 models - dual stat/mounting
bracket, flow and return connections and removable cover plate
5.3 36/46 mODEL ONLY
FLOW CONNECtiON
A 28mm compression connection is supplied for the boiler flow
connection. This is located on the right hand side of the boiler
behind a removable cover plate. To gain access to the connection,
unscrew and remove the two screws from the top flange of the
cover plate and remove cover plate from boiler. Refer to Figure
5-2.
Figure 5-2:
36/46 model - dual stat/mounting bracket, flow and
return connections and removable cover plate
A bent 28mm flow pipe, with two thermostat pockets, is supplied
with the boiler to be fitted into the flow connection, as follows:
1. With the cover plate removed, loosen the compression nut
and fit the longer leg of the bent flow pipe into the connection.
2. Ensure that the pipe is vertical and fully pushed into the
connection.
3.
With the open end of the flow pipe pointing in the required
direction (see below), fully tighten the compression nut. Refer
to Figure 5-3.
4. Replace cover plate and secure with the two screws
previously removed.
Figure 5-3:
36/46 model - flow pipe fitted (cover plate removed)
The direction of the bent flow pipe will depend on the flue system
being used with the boiler.
If a Grant low level balanced flue (Yellow System) or external
balanced flue system (Green System) is used, the flow pipe must
be positioned as follows:
•
If the flue points towards the right of the boiler (viewed from
the front), the flow pipe must be set to point either to the right
or to the front of the boiler to avoid clashing with the flue.
•
If the flue points towards the rear of the boiler, the flow pipe
must be set to point either to the rear, to the right or to the
front of the boiler to avoid clashing with the flue.
•
If the flue points towards the left of the boiler (viewed from
the front), the flow pipe must be set to point either to the rear,
to the right or to the front of the boiler to avoid clashing with
the flue.
Section 5: pipe Connections
page 16
5 pipE CONNECtiONS
Summary of Contents for Vortex VTXBH1521
Page 51: ...Notes Page 51 NOTES...