Section 9: Boiler Operation
Page 41
9.9 Boiler Operation Flow Chart
Time > ‘Post Ventilation’
Setting (120 seconds)
Lux % < ‘Flame
Off’ Setting (4%)
Pellet auger run
time > 480 mins
Mains Power
to Boiler On
Time > ‘Pre Load Time’ setting
(46 seconds)
Switched Live
Input Off
Switched Live
Input Off
Switched Live
Input Off
Switched Live Input Off
Lux % < ‘Flame
Off’ Setting (4%)
Time > ‘Feed Time Reduced’
Setting (220 seconds)
Lux % > ‘Flame On’ Setting (20%)
Time > ‘Time Flame Stabilisation’
Setting (10 seconds)
Fan Proving Check OK
Temp < (Set point – Temp Delta)
& Switched Live Input on
Switched Live Input Off
Standby
Wait Pre Load Brazier
Fan Proving Check
Lighting Feed
Reduced
Wait Pre Load Brazier
Flame Stabilisation
Lighting
Modulation Level
Turning Off Brazier
Wait Post Purge
Boiler Clean
Turning Off Brazier
Boiler Clean
Wait Post Purge
Figure 9-7:
Boiler control sequence flow chart