background image

 

46

CB-610

ML01

CB-610

ML01

CB-610

ML01

CB-610

ML01

BA-S10

BA-A1

BA-A1

BA-S10

CB-610

ML01

CB-610

ML01

CB-610

ML01

BA-A1

BA-S10

CB-610

ML01

BA-A1

BA-A1

BA-A1

CB-610

ML01

CB-610

ML01

CB-610

ML01

CB-610

ML01

MIDDLE INSIDE VIEW

MIDDLE INSIDE VIEW

MIDDLE OUTSIDE VIEW

CORNER INSIDE VIEW

CORNER INSIDE VIEW

CORNER OUTSIDE VIEW

CB-610

ML01

CB-610

ML01

3. Use the CB-610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams           ,          ,          ,          ,          , and          ,  at the 

bottom of this page. Note the CB-610’s will be on the outside and the ML01 nut will be on the inside. 
4. Install the BA-A1 and BA-S10 bolts into the large circular holes on the bottom side of the base kit, as is shown in the diagrams below. You may 

choose to place the BA-A1 and BA-S10 in opposite holes of what are shown in diagram          ,          , and         .

GRANDIO SUMMIT 12x20 STEEL BASE KIT ASSEMBLY

12X20 S

TEEL
 EAR
TH BASE

Summary of Contents for GRA-BASE-S128

Page 1: ...LATION WARNINGS CHOOSING YOUR SURFACE BASE KIT ASSEMBLY INSTRUCTIONS SECURING BASE KIT TO SURFACE FOR ALL SIZES WARRANTY G R E E N H O U S E S GRANDIO 2018 Grandio Greenhouses Backyard Living Source I...

Page 2: ...lacement BASE KIT PARTS LISTS quick reference for base kit assemblies CHAPTER 1 12x8 Greenhouse Dimensions Base Kit Installation Instructions CHAPTER 2 12x12 Greenhouse Dimensions Base Kit Installatio...

Page 3: ...andio Greenhouse will be covered on your policy Call your local utilities companies before digging Do not attempt to begin construction on a windy day plan to complete assembly in one day Damage cause...

Page 4: ...we recommend marking a small x on a corner of each panel to determine which side has the UV Coating as you cannot visually determine with your eye in the case of future disassembly Due to shipping th...

Page 5: ...aying all of your boxes out as shown on the graphic below for an organized assembly Locate your greenhouse size and situate your boxes near your assembly site as shown in the order listed below Invent...

Page 6: ...ive in a windy location there is no way to build a 100 storm safe greenhouse but there are a number of things you can do to minimize the chance of damage Ensure that the base is level and square be su...

Page 7: ...FM 4 EXTENSION RIGHT 93 7 16 in 2374 mm FM 8 EXTENSION LEFT 93 7 16 in 2374 mm FM 8 EXTENSION RIGHT 11 3 16 300 mm 609 CONNECTOR ALLEN FLANGED SCREW 6 8 FM BASE CORNER GUARD 100MM CORNER PIECE FOR AL...

Page 8: ...AGE BOLT 6 10 FLANGED NUT MID BRACKET FOR BASE 5 7 16 in 138 mm END BRACKET FOR BASE 3 15 16 in 100 mm 12 EARTH ANCHOR 1 2 x 3 4 COMBOS FOR ATTACHING FLAT MOUNT TO THE STEEL BASE 0 2 2 2 0 52 52 2 4 1...

Page 9: ...94 25 L Door Dimensions 41 5 W x 85 25 H Bottom Side of Gutter Height 57 H Peak Roof Height 111 H 12x8 Grandio Summit with Steel Base Kit Dimensions The Steel Base Kit is sold separately from the Summ...

Page 10: ...hen attach the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then secured to the surface of your choice using the proper anchoring hardware You...

Page 11: ...oors to be located Be sure the pieces are laid out exactly like the diagram note that notches will have a 23 gap between each other no notches should be right next to each other except at the corners...

Page 12: ...BS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 12B 14 12A FRONT EXTERIOR VIEW CONNECTION OF 14 PARTS WITH SCREWS AFS 68 FRONT 12A 12B GRANDIO SUMMIT 12x8 FLAT MOUNT BASE ASSEM...

Page 13: ...instructions that come with your anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C and the Right side 12C in place with the anchors in...

Page 14: ...is not included purchase at a local hardware store The side sections of the Flat Mount Base Kit will attach on top of the Steel Base Kit prior to earth install the front and back walls must be assembl...

Page 15: ...shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side of the base kit and the large round ho...

Page 16: ...610 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01...

Page 17: ...ghten the hardware using the W16 10 mm Wrench and W17 Allen Driver Set aside the Front and Back sections of the Flat Mount Base these sections will be required to assemble the front and back walls in...

Page 18: ...then mark the ground where the BA A1 L Bolts will reside with a marking paint You will then move base aside in order to dig out the holes 2 Dig out the holes for the BA A1 anchors then con rm the base...

Page 19: ...Door Dimensions 41 5 W x 85 25 H Bottom Side of Gutter Height 57 H Peak Roof Height 111 H 12x12 Grandio Summit with Steel Base Kit Dimensions The Steel Base Kit is sold separately from the Summit Gree...

Page 20: ...ch the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then secured to the surface of your choice using the proper anchoring hardware You will dri...

Page 21: ...ve a 23 gap between each other no notches should be right next to each other except at the corners See and to con rm you have the correct orientation prior to assembly Note The 12D and 12E pro les may...

Page 22: ...AFS 68 screws see diagram 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 12B 14 12A FRONT EXTERIOR VIEW CONNECTION OF 14 PARTS WIT...

Page 23: ...th your anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C and 12D and the Right side 12C and 12E in place with the anchors installed an...

Page 24: ...purchase at a local hardware store The side sections of the Flat Mount Base Kit will attach on top of the Steel Base Kit prior to earth install the front and back walls must be assembled using the fro...

Page 25: ...as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side of the base kit and the large round...

Page 26: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Page 27: ...ide the Front and Back sections of the Flat Mount Base these sections will be required to assemble the front and back walls in Manual 2 Note The 12D and 12E pro les may be labeled incorrectly on this...

Page 28: ...e aside in order to dig out the holes 2 Dig out the holes for the BA A1 anchors then con rm the base is square and level again with the base kit moved back into place and BA A1 s in their respective h...

Page 29: ...el Base Kit is sold separately from the Summit Greenhouse Kit and is designed to be installed directly into the Earth using the included L Bolts which must be secured into Quikrete or a similar concre...

Page 30: ...ttach the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then secured to the surface of your choice using the proper anchoring hardware You will...

Page 31: ...eces are laid out exactly like the diagram note that notches will have a 23 gap between each other no notches should be right next to each other except at the corners See and to con rm you have the co...

Page 32: ...AFS 68 screws see diagram 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 12B 14 12A FRONT EXTERIOR VIEW CONNECTION OF 14 PARTS WIT...

Page 33: ...th your anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C and 12F and the Right side 12C and 12G in place with the anchors installed an...

Page 34: ...Quikrete or a similar concrete material NOTE concrete is not included purchase at a local hardware store The side sections of the Flat Mount Base Kit will attach on top of the Steel Base Kit prior to...

Page 35: ...Kit exactly as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side of the base kit and the...

Page 36: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Page 37: ...the hardware using the W16 10 mm Wrench and W17 Allen Driver Set aside the Front and Back sections of the Flat Mount Base these sections will be required to assemble the front and back walls in Manua...

Page 38: ...2 Dig out the holes for the BA A1 anchors then con rm the base is square and level again with the base kit moved back into place and BA A1 s in their respective holes Check with your local building c...

Page 39: ...rom the Summit Greenhouse Kit and is designed to be installed directly into the Earth using the included L Bolts which must be secured into Quikrete or a similar concrete material The Flat Mount Base...

Page 40: ...ttach the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then secured to the surface of your choice using the proper anchoring hardware You will...

Page 41: ...ill have a 23 gap between each other no notches should be right next to each other except at the corners See and to con rm you have the correct orientation prior to assembly Note The 12D and 12E pro l...

Page 42: ...AFS 68 screws see diagram Repeat connecting the 12F with the 12D 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 12B 14 12A FRONT E...

Page 43: ...our anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C 12F and 12D and the Right side 12C 12G and 12E in place with the anchors installe...

Page 44: ...rchase at a local hardware store The side sections of the Flat Mount Base Kit will attach on top of the Steel Base Kit prior to earth install the front and back walls must be assembled using the front...

Page 45: ...e Kit exactly as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side of the base kit and th...

Page 46: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Page 47: ...he Front and Back sections of the Flat Mount Base these sections will be required to assemble the front and back walls in Manual 2 Note The 12D and 12E pro les may be labeled incorrectly on this produ...

Page 48: ...ase is square and level again with the base kit moved back into place and BA A1 s in their respective holes Check with your local building code for depth requirements 3 We recommend you use a concrete...

Page 49: ...rom the Summit Greenhouse Kit and is designed to be installed directly into the Earth using the included L Bolts which must be secured into Quikrete or a similar concrete material The Flat Mount Base...

Page 50: ...Kit will be assembled as shown in this section then secured to the surface of your choice using the proper anchoring hardware You will drill all holes into your surface for the entire base kit and tem...

Page 51: ...the pieces are laid out exactly like the diagram note that notches will have a 23 gap between each other no notches should be right next to each other except at the corners See and to con rm you have...

Page 52: ...AFS 68 screws see diagram Repeat connecting the 12F with the 12F 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 12B 14 12A FRONT E...

Page 53: ...our anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C 12F and 12F and the Right side 12C 12G and 12G in place with the anchors installe...

Page 54: ...ust be secured with Quikrete or a similar concrete material NOTE concrete is not included purchase at a local hardware store The side sections of the Flat Mount Base Kit will attach on top of the Stee...

Page 55: ...arts for your Steel Base Kit exactly as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side...

Page 56: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Page 57: ...hardware using the W16 10 mm Wrench and W17 Allen Driver Set aside the Front and Back sections of the Flat Mount Base these sections will be required to assemble the front and back walls in Manual 2...

Page 58: ...es are level then mark the ground where the BA A1 L Bolts will reside with a marking paint You will then move base aside in order to dig out the holes 2 Dig out the holes for the BA A1 anchors then co...

Page 59: ...from the Summit Greenhouse Kit and is designed to be installed directly into the Earth using the included L Bolts which must be secured into Quikrete or a similar concrete material The Flat Mount Base...

Page 60: ...will follow these instructions to assemble the Flat Mount section but will then attach the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then s...

Page 61: ...e front is where you want your doors to be located Be sure the pieces are laid out exactly like the diagram note that notches will have a 23 gap between each other no notches should be right next to e...

Page 62: ...AFS 68 screws see diagram Repeat connecting the 12F with the 12F and 12F with 12D 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 1...

Page 63: ...anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C 12F 12F and 12D and the Right side 12C 12G 12G and 12E in place with the anchors inst...

Page 64: ...om the Summit Greenhouse Kit and is to be installed directly into the Earth using the included L Bolts which must be secured with Quikrete or a similar concrete material NOTE concrete is not included...

Page 65: ...FT 1 Lay out all the parts for your Steel Base Kit exactly as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes a...

Page 66: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Page 67: ...NSTALLATION 1 Attach the side Flat Mount Base pieces to the Steel Base Kit as shown below using the ABS 625 screws with the ML01 nuts See and Tighten the hardware using the W16 10 mm Wrench and W17 Al...

Page 68: ...heck that all sides are level then mark the ground where the BA A1 L Bolts will reside with a marking paint You will then move base aside in order to dig out the holes 2 Dig out the holes for the BA A...

Page 69: ...from the Summit Greenhouse Kit and is designed to be installed directly into the Earth using the included L Bolts which must be secured into Quikrete or a similar concrete material The Flat Mount Base...

Page 70: ...will follow these instructions to assemble the Flat Mount section but will then attach the Flat Mount Kit onto your Steel Base Kit The Flat Mount Kit will be assembled as shown in this section then s...

Page 71: ...parts exactly as shown in the diagram below Con rm that the front is where you want your doors to be located Be sure the pieces are laid out exactly like the diagram note that notches will have a 23...

Page 72: ...AFS 68 screws see diagram Repeat connecting the 12F with the 12F and 12F with 12F 6 Assemble the base kit as shown using the ABS 610 screws with the SQ NUT 6 nuts at the 1C corners See diagrams and 1...

Page 73: ...anchoring kit Drill the holes into your surface blow out the debris then install the screws Keep the Left side 12C 12F 12F and 12F and the Right side 12C 12G 12G and 12G in place with the anchors inst...

Page 74: ...ectly into the Earth using the included L Bolts which must be secured with Quikrete or a similar concrete material NOTE concrete is not included purchase at a local hardware store The side sections of...

Page 75: ...your Steel Base Kit exactly as shown in the diagram below failure to assemble exactly as shown will cause problems later in assembly 2 Con rm that the small oval holes are all on the top side of the...

Page 76: ...10 ML01 CB 610 ML01 3 Use the CB 610 bolts with the ML01 nuts to assemble the steel base kit as shown in diagrams and at the bottom of this page Note the CB 610 s will be on the outside and the ML01 n...

Page 77: ...ACHING THE FLAT MOUNT BASE TO THE STEEL BASE KIT FOR EARTH INSTALLATION 1 Attach the side Flat Mount Base pieces to the Steel Base Kit as shown below using the ABS 625 screws with the ML01 nuts See an...

Page 78: ...will then move base aside in order to dig out the holes 2 Dig out the holes for the BA A1 anchors then con rm the base is square and level again with the base kit moved back into place and BA A1 s in...

Page 79: ...ated expenses for removal installation or replacement of the greenhouse or its components are not covered under this warranty 4 This warranty does not cover scratching or scuf ng of the product that m...

Page 80: ...ASE KIT SEE INSTALLATION MANUAL 2 GREENHOUSE ASSEMBLY SEE PARTS LIST MANUAL 3 PARTS LIST G R E E N H O U S E S GRANDIO Save this owner s manual for future reference and if you need our help CONTACT OU...

Reviews: