48
GRANDIO 12x20 SUMMIT STEEL BASE KIT EARTH INSTALLATION
**BASE MUST BE LEVEL & SQUARE,
FOUNDATION MUST BE PROPERLY ANCHORED PRIOR TO GREENHOUSE ASSEMBLY
WARNING: BASE KIT MUST BE LEVEL AND SQUARE, AN UNLEVEL BASE WILL AFFECT THE INTEGRITY OF YOUR GREENHOUSE.
1. Align the Steel Base Kit to your desired location. Measure corner to corner to confirm square, check that all sides are level, then mark the
ground where the BA-A1 L-Bolts will reside with a marking paint. You will then move base aside in order to dig out the holes.
2. Dig out the holes for the BA-A1 anchors, then confirm the base is square and level again with the base kit moved back into place and BA-A1’s
in their respective holes. Check with your local building code for depth requirements.
3. We recommend you use a concrete mix such as Quikrete® fast setting concrete to secure the BA-A1 L-Bolts into place.
4. Follow the directions on your concrete mix. Confirm as the mix sets that the base is level and square. The BA-A1 L-Bolts may be adjusted up or
down by turning the nuts attached to each BA-A1 that sandwich the base kit to assist in leveling the base kit after curing.
BA-A1 * Must be inserted
into the ground, and secured
with concrete.
BA-A1
12x20
Steel Base Kit Assembled
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
BA-A1
12X20 S
TEEL
EAR
TH BASE