![Granby KHM-1/090 Installation, Operation And Service Manual Download Page 28](http://html1.mh-extra.com/html/granby/khm-1-090/khm-1-090_installation-operation-and-service-manual_2254873028.webp)
27
Electric box with a Beckett burner application
Transforming the factory assembly Riello electric box
to a Beckett electric box
STEP 1 :
Locate and disconnect the 2-pin Molex connector.
STEP 2 :
Connect the 2-pin connector to the 2-pin harness
provided in the Beckett burner box.
STEP 3 :
Connect the 2 wires (black and
grey) of the 2-pin harness to the TW and
TR connection on the GeniSys primary
control