
Prime
Prime
Prime System
System
System
1.
Close the main air slider valve (CA).
2.
If using a manual gun, lock the dispense valve
trigger open by pulling and securing the trigger
using the trigger retainer (Z).
3.
Place the dispense valve over a waste container.
4.
Press the pause material tracking button
on home screen.
5.
Slowly open the main air slider valve (CA).
6.
Prime the system until a smooth flow of material
dispenses from each dispense valve.
Note
On initial system startup, the pump will
cycle until the hoses are filled. If a new
drum was placed on the frame, the pump
will cycle until all air has been removed.
7.
Close the main air slider valve (CA) and release
trigger lock.
8.
Engage trigger lock.
Figure 22 Trigger Lock Engaged
9.
Press
to engage material tracking.
10. Turn the air motor regulator to operating
pressure.
Note
The system is now ready to operate.
Setback
Setback
Setback Mode
Mode
Mode
Set the ADM to setback mode if the system will only
be inactive for a few hours. This will reduce the time
system needs to return to setpoint temperatures.
1.
Press
to enter Setback Mode.
Note
The amount of time before the pump
is automatically placed in setback is
determined by the Pump Inactivity Timeout,
located on System Setup Screen 1. See
.
334130D
33
Summary of Contents for Therm-O-Flow 200
Page 48: ...Repair Figure 28 48 334130D...
Page 56: ...Repair Figure 34 Inside of Electrical Control Enclosure 56 334130D...
Page 59: ...Electrical Schematics 400V 400V 400V 3 3 3 Phase 50 Phase 50 Phase 50 Hz Hz Hz 334130D 59...
Page 61: ...Electrical Schematics AWB AWB AWB and and and MZLP 1 MZLP 1 MZLP 1 334130D 61...
Page 63: ...Electrical Schematics MZLP MZLP MZLP Zones Zones Zones 334130D 63...
Page 67: ...Parts Electrical Electrical Electrical Module Module Module 334130D 67...
Page 68: ...Parts 68 334130D...