Setup
16
309551C
Setup
See T
* Full load amps with all devices operating at maximum
capabilities. Fuse requirements at various flow rates and
mix chamber sizes may be less.
** E-20 and E-XP1 with 210 ft (64.1 m) hose; E-30 and
E-XP2 with 310 ft (94.6 m) hose.
1.
Locate Reactor
a.
Locate Reactor on a level surface.
b.
Do not expose Reactor to rain.
c.
To mount on a truck bed, secure rear
axle with 15B805 Mobile Mounting
Bracket (MB), available separately. Bolt
bracket and mounting feet (MF) of
Reactor to truck bed.
TI3548a
MB
MF
2.
Electrical requirements
WARNING
Installing this equipment requires access to parts
which may cause electric shock or other serious injury
if work is not performed properly. Have a qualified
electrician connect power and ground to main power
switch terminals, see page 17. Be sure your installa-
tion complies with all National, State and Local safety
and fire codes.
Table 1: Electrical Requirements
(kW/Full Load Amps)
E SERIES
Part No.
Model
Voltage
(phase)
Full
Load
Peak
Amps*
System
Watts**
246025
E-20
230V (1)
48
10,200
246026
E-30
230V (1)
78
17,900
246030
E-20
380V (3)
24
10,200
246031
E-30
380V (3)
34
17,900
246034
E-20
230V (3)
32
10,200
246035
E-30
230V (3)
50
17,900
E-XP SERIES
246024
E-XP1
230V (1)
69
15,800
246028
E-XP2
230V (1)
100
23,000
246029
E-XP1
380V (3)
24
15,800
246032
E-XP2
380V (3)
35
23,000
246033
E-XP1
230V (3)
43
15,800
246036
E-XP2
230V (3)
62
23,000