Setup
18
309551C
4.
Connect feed pumps
a.
Install feed pumps (K) in component A
and B supply drums. See F
. 1 and
b.
Seal component A drum and use desic-
cant dryer (M) in vent.
c.
Install agitator (L) in component B drum,
if necessary.
d.
Connect supply hoses (J) from feed
pumps to Reactor fluid inlet valves (FV).
Supply hoses from feed pumps should be 3/4 in.
(19 mm) ID.
TI2501A
FV
J
5.
Connect pressure relief
lines
WARNING
Do not install shutoffs downstream of the PRESSURE
RELIEF/SPRAY valve outlets (BA, BB). The valves
function as overpressure relief valves when set to
SPRAY. Lines must be open so valves can automati-
cally relieve pressure when machine is operating.
If circulating fluid back to the supply drums, use high
pressure hose rated to withstand the maximum work-
ing pressure of this equipment.
a.
Recommended:
Connect high pres-
sure hose (R) to relief fittings (BA, BB)
of both PRESSURE RELIEF/SPRAY
valves, Route hose back to component
A and B drums. See F
b.
Alternately:
Secure supplied bleed
tubes (N) in grounded, sealed waste
containers (H). See F
TI3171a
BA
BB