Maintenance
310622ZAL
15
Preventive Maintenance Schedule
Establish a preventive maintenance schedule based on
the pump’s service history. This is especially important
for prevention of spills or leakage due to diaphragm
failure.
The following is a list of recommended maintenance
procedures and frequencies. Maintenance must be per-
formed by trained personnel per the established
schedule.
Task
Operator
Maintenance Person
Daily
Weekly
Monthly
Inspect system for leaks
✓
Depressurize fluid, after operation
✓
Remove heat from system, after
operation
✓
Inspect diaphragm for wear
✓
Inspect check valve components
for wear
✓
Check hoses for wear
✓
Check/tighten fluid connections
✓
Check/tighten air connections
✓
Lubricate air valves
✓
Summary of Contents for SaniForce 1590 3A
Page 5: ...Models 310622ZAL 5...