Drum Replacement
6
3A5919A
Drum Replacement
Removal
1. Remove four bolts and Drum Access Panel (H).
2. Slide drum off of hex shaft.
Installation
NOTE:
Carbide Flail Cutter drums do not require
specific orientation or direction. Carbide Millers and
Diamond Blades are directional. They should be
stacked so that the arrows on the Millers and Blades
face the same direction as the rotation of the drum.
DC89
and
DC1013
models are designed for “forward
cut” grinding (the drum rotates in the same direction that
it travels).
DC1021
Model
is designed
for “reverse (up
cut)” grinding (the drum rotates in the opposite direction
that it travels).
1. Slide replacement drum onto hex shaft.
2. Lower Drum Adjustment Dial (D) and pull Drum
Engage Lever (E) so drum rests on ground.
3. Replace Drum Access Panel (H) and tighten four
bolts to 27-30 ft-lb (37-41 N•m).
Avoid touching or handling drum after use until it has
completely cooled. To avoid injury from unexpected
start up, disconnect spark plug wire and black battery
cable (DC1021 G only) before you service your unit.
ti14767b
ti14765a
Carbide Miller
Diamond Blade
Forward Cut (DC89 and
Reverse/up cut (DC1021 Model)
ti15138a
ti15137a
DC1013 Models)
ti14766a
ti14756a
ti14755a
ti14764b