8.
Engage the bung pin to hold the bung open and
allow air to enter.
9.
Open the abrasive ball valve and flush the pot of
any remaining abrasive material.
10. Close the pot bung and connect the
abrasive hose. Relieve pressure
to complete system shutdown (see
Pressure Relief Procedure, page 8
NOTE:
NOTE:
NOTE: The system must be winterized if it will
be exposed to temperatures below freezing. See
Winterizing the Equipment, page 21
.
20
334143C
Summary of Contents for EcoQuip 300
Page 5: ...Notes Notes Notes Notes 334143C 5...
Page 34: ...Parts Parts Parts Parts EQ300 EQ300 EQ300 and and and EQ600 EQ600 EQ600 34 334143C...
Page 36: ...Parts Enclosure Enclosure Enclosure 12 Torque fitting to 35 40 ft lb 47 54 N m 36 334143C...