Connecting
Connecting
Connecting the
the
the Blast
Blast
Blast Hose
Hose
Hose and
and
and Air
Air
Air
Hose
Hose
Hose
1.
Always purge the air supply hose 15–20 seconds
before connecting the air supply hose from the
compressor (or on-site compressed air source)
to the panel. Make sure all debris is cleared from
the hose.
2.
Connect an appropriately sized air
supply hose to the air inlet. See
Technical Specifications, page 44
NOTE:
NOTE:
NOTE: Make sure to properly install hose
restraints and coupler pins to the quick-coupler
and the air line. If the holes on the quick-coupler
do not align, there is something wrong and the
two couplers are not compatible. DO
DO
DO NOT
NOT
NOT TURN
TURN
TURN
ON
ON
ON THE
THE
THE AIR
AIR
AIR. Seek help to get the situation
resolved.
3.
Open the air supply valve (125 psi, 8.6 Bar, 0.86
MPa maximum). If necessary, use a regulator in
the supply air line to meet these specifications.
OF
F
ST
AR
T
RU
N
NOTE:
NOTE:
NOTE: Make sure the air supply meets
the appropriate
appropriate
appropriate air
air
air flow
flow
flow requirements.
requirements.
requirements. See
Technical Specifications, page 44
4.
Connect the blast hose, hose restraints, control
hoses, and coupler pins.
ti24706a
NOTE:
NOTE:
NOTE: If you are using an electric blast control,
check all of the electrical connections from the
panel to the blast control.
NOTICE
NOTICE
NOTICE
Make sure no electrical connections will
be exposed to water. Exposure to water
could cause a short circuit and damage the
equipment.
10
334143C
Summary of Contents for EcoQuip 300
Page 5: ...Notes Notes Notes Notes 334143C 5...
Page 34: ...Parts Parts Parts Parts EQ300 EQ300 EQ300 and and and EQ600 EQ600 EQ600 34 334143C...
Page 36: ...Parts Enclosure Enclosure Enclosure 12 Torque fitting to 35 40 ft lb 47 54 N m 36 334143C...