Setup
40
3A2797ZAA
17.
Install GX-16 Orifices
a. Close both A side (Red) and B side (Blue) feed
inlet valves on the system. See F
. 2 on page
b. Close A side (Red) material return ball valves on
the material tank stand.
on page 43.
d. Remove plugs from GX-16.
e. Install orifices provided.
18.
Pressure check hose
See hose manual. Pressure check for leaks. If no leaks,
wrap hose and electrical connections to protect from
damage.
19.
Check hydraulic fluid level
Hydraulic reservoir is filled at the factory. Check fluid
level before operating the first time, and weekly thereaf
-
ter. See
on page 117 for specifications.
F
IG
. 23: GX-16 Plug Location
ti17747a
Orifice
(A) Side
Summary of Contents for 24N572
Page 31: ...Setup 3A2797ZAA 31...