PCD Pump User Guide
Installation
2/20/19
GPD Global
®
5
Machine Integrated Controller
This GPD Global controller allows integrators to use PCD pumps in their
designs. Requirements:
•
24V signal to enable forward motion
•
24V signal to enable reverse motion
•
Variable 0-10V signal to control the speed in forward or reverse
Install on GPD Global MAX Series or DS Series Robotic System
PCD3H, PCD4H, PCD4HB, PCD6HB, PCD7H
To mount one of these PCD pump models on a standard GPD Global MAX Series or DS
Series dispensing system:
1. Mount material on the pump.
2. Mount the pump in the Taper-Lock™ mount:
a. Press down and hold the latching lever at the top of the mount.
b. Align and engage the pump with the top dowel pin of the mount.
c. Apply downward pressure to the pump while releasing the latching lever.
3. Connect the two (2) pump cables into the base of the dispensing system Z-axis motor
cover.
PCD3, PCD3L, PCD4, PCD4L, PCD6, PCD7H
NOTE:
To operate pump models PCD3, PCD3L, PCD4, and PCD4L, the GPD Global MAX
Series or DS Series dispensing system must be configured with a tabletop controller and cable
for pump control. To mount one of these PCD pump models on an upgraded dispensing
system (configured with a tabletop controller and cable):
1. Mount material on the pump.
2. Press the dispenser MOTION STOP button to remove power from the PCD controller.
3. Mount the pump in the Taper-Lock™ mount:
a. Press down and hold the latching lever at the top of the mount.
b. Align and engage the pump with the top dowel pin of the mount.
c. Apply downward pressure to the pump while releasing the latching lever.
4. Connect the pump cable to the dispenser receptacle panel.
5. Release the MOTION STOP button to return power to the PCD controller.
Install on Non-GPD Equipment
For easy-installation options available for mounting any model of PCD pump on non-GPD
hardware, refer to
Mounting Hardware
(pg 3).