PCD Pump User Guide
Installation
2/20/19
GPD Global
®
6
Integration on Table Top Systems
All relevant settings for your production results can be
easily saved via a graphic user interface if you operate
your dispense pump with a GPD Global PCD Tabletop
Controller especially matched to the pump.
Install on GPD Global Island Series Robotic System
PCD3, PCD3L, PCD4, PCD4L, PCD6, PCD7H
To mount a PCD pump on a GPD Global Island Series dispensing system:
1. Turn off the PCD Tabletop Controller or, if system is configured with one, turn off the pump
power switch.
2. Mount the pump in the Taper-Lock™mount:
a. Press down and hold the latching lever at the top of the mount.
b. Align and engage the pump with the top dowel pin of the mount.
c. Apply downward pressure to the pump while releasing the latching lever.
3. Connect the pump cable to the power port on the Z axis.
4. Turn on the PCD Tabletop Controller or, if your system is configured with one, turn on the
pump power switch.
Install Pump in PCD Table Stand
PCD3, PCD3L, PCD4, PCD4L, PCD6, PCD7H
To mount a PCD pump in a PCD Table Stand:
1. Place a PCD Table Stand on a level surface.
Table 3:
Pumps with Table Top
Capability
Pump
Controller
PCD3
x
PCD3L
x
PCD3H
–
PCD4
x
PCD4L
x
PCD4H
–
PCD4HB
–
PCD6
x
PCD6HB
–
PCD7H
x