![Gossen MetraWatt METRALINE PAT Operating Instructions Manual Download Page 25](http://html.mh-extra.com/html/gossen-metrawatt/metraline-pat/metraline-pat_operating-instructions-manual_2247297025.webp)
GMC-I Messtechnik GmbH
25
10.3.3 I
EA
– Probe-Probe (GND)
Connection
➭
Connect the first probe to the black GND
socket.
➭
Connect the second probe to the red
probe socket.
Procedure
➭
Press the
I
EA
key.
➭
Select the “
Probe-Probe
” menu with the
help of the
scroll keys.
➭
Start the measurement by pressing the
OK
key.
➭
Contact the short-circuited L and N pins
in the DUT’s mains plug with the first
probe.
➭
Contact all of the DUT’s insulated, con-
ductive parts with the second probe.
➭
You can repeat the measurement by
pressing the
scroll key (reset). The
max. value is cleared.
Note!
There’s no limit value for this mea-
surement, and thus there’s no corre-
sponding LED display.