THESE TWO HOLE LOCATIONS WILL
BE EMPTY ON YOUR SWING BEAM.
LINE THEM UP WITH THE HOLES IN
THE SWING LEG BRACKET UNDER
THE SWING BEAM.
STEP 50: REST SWING BEAM ON FORT
*TWO PEOPLE ARE REQUIRED FOR THIS STEP
1: LAY THE SWING BEAM ACROSS THE TOP OF THE FORT RAILINGS. THE END OF THE SWING BEAM WITH TWO EMPTY
HOLES SHOULD OVERHANG THE SIDE OF THE FORT WITH THE TRIANGULAR SWING BEAM PLATE.
2: SIT THE SWING BEAM LEGS UPRIGHT UNDER THE TWO EMPTY HOLES IN THE END OF THE SWING BEAM.
94
Summary of Contents for 1500GWF
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 41: ...5 4 X 6 X 10 ROOF PEAK SUPPORT 125 6 1000 RPS 2 PICTURE DESCRIPTION QTY 30 ...
Page 143: ...APPENDIX 132 ...
Page 147: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...