A
B
4 X 4 X 120
REAR CORNER POST
(ON LEFT SIDE)
4 X 4 X 120
REAR CORNER POST
(ON RIGHT SIDE)
DETAIL B
SCALE 1 : 8
T-NUT
DETAIL A
SCALE 1 : 8
T-NUT
STEP 21: UPPER LEVEL CORNER POST T-NUTS
5: THE BARREL OF THE T-NUT SHOULD GO IN THE HOLE FIRST. HAMMER THE T-NUT UNTIL IT IS FLUSH/ALMOST
FLUSH TO THE CORNER POST.
FRONT OF FORT
1: THIS STEP IS CRITICAL TO BUILDING THE UPPER LEVEL PROPERLY. IF ANY MISTAKES ARE MADE HERE, YOU
WILL NEED TO DIS-ASSEMBLE AND THEN RE-ASSEMBLY TO MAKE YOUR CORRECTIONS.
2: MAKE SURE HOLES ARE FREE OF ANY OBSTRUCTIONS. USE A BOLT TO CLEAN OUT ANY DEBRIS.
3: USE THE DIAGRAM BELOW TO CORRECTLY IDENTIFY AND ORIENT POSTS PROPERLY.
4: USE A HAMMER TO SEAT THE T-NUTS AFTER INSERTING THEM INTO THE HOLES SHOWN IN THE DIAGRAM
BELOW.
65
Summary of Contents for 1500GWF
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 41: ...5 4 X 6 X 10 ROOF PEAK SUPPORT 125 6 1000 RPS 2 PICTURE DESCRIPTION QTY 30 ...
Page 143: ...APPENDIX 132 ...
Page 147: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...