Goodwe LX F12.8-30 User Manual Download Page 7

02  Safety Precaution

User Manual V1.0-2022-11-01

03

CAUTION

• 

Protect the battery system from damage during transportation and storage.

• 

The transportation must be carried out by trained professionals. All operations during the 

process have to be recorded.

• 

Keep the equipment stable to avoid dumping, which can result in equipment damage and 

personal injuries.

• 

Place the cables at least 30mm away from the heating components or heat sources, 

otherwise the insulation layer of the cables may be aging or broken due to high 

temperature.

• 

• 

Tie the cables of the same type together, and place cables of different types at least 30mm 

apart. Do not place the cables entangled or crossed.

 

Potential risks exist. Wear proper 

personnel protective equipment 

before any operations.

Install  the  equipment  away  from 

fire sources.

 

HIGH VOLTAGE HAZARD High 

voltage exists during the 

equipment’s running.

Ensure the equipment is power off

before any operations.

Keep  the  equipment  away  from 

children.

 

Operate the equipment properly to 

avoid explosion danger.

It is forbidden to dismantle the 

equipment personally.

 

The  equipment  contains  corrosive 

electrolytes. In case of a leak in 

the  equipment,  avoid  contact  the 

leaked liquid or gas.

Do  not  short-circuit  the  positive 

and  negative  pole  of  the 

equipment.  Otherwise  it  may 

cause damage to the cables.

 

Batteries contain flammable 

materials, beware of fire.

Grounding point.

 

Read through the user manual 

before any operations.

SGS marking for United States 

and Canada

Label Description

DANGER

• 

The battery equipment is heavy. Please equip the corresponding personnel according to its 

weight, so that the equipment does not exceed the weight range of the human body can 

carry, and cause personnel injury.

• 

Contact After Sale Service immediately if the battery is not able to be started. Otherwise, the 

battery might be damaged permanently.

• 

Do not move the battery system if it is connected with external battery modules. Contact 

after-sales service if the battery shall be replaced or added.

Summary of Contents for LX F12.8-30

Page 1: ...V1 0 2022 11 01 User Manual Rechargeable Li ion Battery System Lynx Home FH Series US...

Page 2: ...ll descriptions here are for guidance only and other GOODWE trademarks are trademarks of GoodWe Technologies Co Ltd All other trademarks or registered trademarks mentioned in this manual are owned by...

Page 3: ...eck Before Receiving 09 4 2 Deliverables 09 4 3 Storage 10 5 System Installation 11 5 1 Installation Requirements 11 5 2 Installing the Battery System 12 6 Electrical Connection 16 6 1 Safety Precauti...

Page 4: ...ual V1 0 2022 11 01 III 7 4 Indicator Status 26 7 4 1 Normal Status 26 7 4 2 Alarming Status 27 7 4 3 Faulty Status 27 08 Maintenance 29 8 1 Power OFF the Battery System 29 8 2 Routine Maintenance 29...

Page 5: ...installation electrical connection commissioning troubleshooting and maintenance Read through this manual before installing and operating the product All the installers and users have to be familiar w...

Page 6: ...All operations during the transportation have to be recorded The equipment shall be kept in balance thus avoiding falling down 2 1 General Safety 2 2 Battery Safety NOTICE The information in this use...

Page 7: ...is power off before any operations Keep the equipment away from children Operate the equipment properly to avoid explosion danger It is forbidden to dismantle the equipment personally The equipment c...

Page 8: ...breathing apparatus If the battery module leaks electrolyte avoid contact with the leaking liquid or gas The electrolyte is corrosive It will cause skin irritation or chemical burn to the operator Any...

Page 9: ...s capacity expansion A maximum of 6 battery modules can be used to extend the usable energy of the battery system 3 1 Product Overview Intended usage Usable energy description 9 60kWh Battery system 1...

Page 10: ...ow or visit the official website to get the Approved Inverter List matched with the Battery System Approved inverter list GoodWe Inverter GE Inverter Battery system 1 Battery system N PV string Batter...

Page 11: ...y 8 Base NOTICE Ensure that the PCU is installed above the battery modules Do not install any battery modules above the PCU This manual will show you the installation and electrical connection of 6 ba...

Page 12: ...anual V1 0 2022 11 01 08 Right View Left View Front View Power control unit appearance No Parts 1 Ventilation valve 2 Cable hole 3 Air switch 4 SOC indicator 5 Button indicator 6 Battery serial connec...

Page 13: ...iving Check the following items before receiving the product 1 Check the outer packing box for damage such as holes cracks deformation and other signs of equipment damage Do not unpack the package and...

Page 14: ...the equipment complying with the labels and requirements on the packing box 4 The equipment must be stacked with caution to prevent them from falling 5 Keep the equipment away from flammable explosive...

Page 15: ...wall when drilling holes 4 Install the equipment in a sheltered place to avoid direct sunlight rain and snow Build a sunshade if it is needed 5 Install the equipment in a well ventilated place to ensu...

Page 16: ...and fireproof Install the equipment on a surface that is solid enough to bear the product weight Put the battery system near the wall and install the locking brackets to prevent the battery from fall...

Page 17: ...Install the locking bracket of the PCU Step 9 Put the PCU above the installed battery module securely Mark the drilling hole with a marker then remove the PCU Step 10 Drill holes with the hammer dril...

Page 18: ...05 System Installation User Manual V1 0 2022 11 01 14...

Page 19: ...User Manual V1 0 2022 11 01 05 System Installation 15...

Page 20: ...ety precautions outlined in this manual and safety labels on the equipment during the operation All operations cables and parts specification during the electrical connection shall be in compliance wi...

Page 21: ...e parallel connected in one energy storage system Ensure that the usable energy of each battery system is the same Install the terminal resistor to the COM3 port of Battery system 1 which is connected...

Page 22: ...conduit and the equipment interface is sealed Otherwise the protection level of the equipment may be affected which may cause damage to the equipment No PIN Definition Silk Print Recommended Cable Dim...

Page 23: ...heat shrink tube Step 4 Connect the PE cable 6 2 2 Connecting the Communication Cable NOTICE Connect the PE cable first before installing the equipment Disconnect the PE cable before dismantling the e...

Page 24: ...the DC cables with the delivered terminals The manufacturer shall not be liable for the damage if other terminals are used Power off the battery system before connecting the power cable to avoid high...

Page 25: ...CAN3H COM1 connects to the BMS communication port on the inverter for communication with the inverter or connects to the parallelized battery system for communication COM2 COM3 BMS communication for...

Page 26: ...ICE If the terminal resistor is not installed the Interlock Failure will occur and the system cannot work correctly Step 1 Disassemble the waterproof module Step 2 Install the terminal resistor Tighte...

Page 27: ...are connected correctly and securely 3 Cable ties are intact routed properly and evenly 4 Unused ports and terminals are sealed Check the following items before power on to avoid the battery system b...

Page 28: ...Battery system N 2 N 8 Parallel Connected Battery System Step 1 Optional Turn on the breaker between the inverter and the battery system Step 2 Turn on the breakers between the battery systems Step 3...

Page 29: ...install the PV Master App Connect your smart phone and the inverter Wi Fi SSID Solar WiFi Password 12345678 Select LX F H US on Select Battery Model window via the PV Master App Set battery model via...

Page 30: ...or Faulty SOC Indicator Button Indicator Button Indicator SOC Indicator Description Idle green light blink 2 times Standby green light blink 1 time Working steady green SOC 5 5 SOC 25 25 SOC 50 50 SO...

Page 31: ...Temperature Power off and wait for 2 hours Contact the After Sale Service if the problem could not be solved Interlock Failure Contact the After Sale Service if the problem could not be solved Others...

Page 32: ...Sale Service if the problem could not be solved Insulation Fault Do not touch the battery Contact the After Sale Service Internal Communication Fault Power off and check the communication cables Resta...

Page 33: ...Do not touch or disassemble privately because the high voltage danger exists In case of other emergencies contact the after sales service as soon as possible Operate following the instructions or wait...

Page 34: ...122 Discharge 5 122 Relative Humidity 95 Altitude Ft 9842 Communication CAN Weight lb 300 9 384 7 468 5 552 3 Dimensions W H D in 23 6 15 29 5 23 6 15 35 6 23 6 15 41 7 23 6 15 47 8 Ingress Protection...

Page 35: ...Official Website Contact Information PV Master App GoodWe Technologies Co Ltd No 90 Zijin Rd New District Suzhou 215011 China www goodwe com service goodwe com...

Reviews: