
06 Electrical Connection
User Manual V1.0-2022-11-01
19
Copper,
Step 1:
Strip the insulation layer and insert the bared conductor into the terminal.
Step 2:
Crimp the PE cable.
Step 3:
Install the heat shrink tube.
Step 4:
Connect the PE cable.
6.2.2 Connecting the Communication Cable
NOTICE
•
Connect the PE cable first before installing the equipment. Disconnect the PE cable before
dismantling the equipment.
•
Prepare the PE cable by Users. The cable should meet standards for outdoor use.
• The drawing force of the cable after crimping should be at least 400N.
Diameter for the PCU routing hole