
05 System Installation
User Manual V1.0-2022-11-01
12
NOTICE
•
Ensure that the ground is flat and no inclination.
•
Ensure that the base stands on the floor vertically.
• Ensurethat the base clings to the wallwith its arrow directs at the wall
•
Align the holes of the upper and the lower battery modules when placing the upper battery
module.
•
Put the locking bracket of the PCU cling to the wall, and ensure that the bottom of the PCU
is vertically and closely put on the battery.
•
Cover the equipment with a cardboard to prevent foreign matters when drilling holes.
•
Beware of the batteries and PCU falling down.
• Do not install the base and the locking bracket on one side.
Mounting Support Requirements
•
The mounting support shall be nonflammable and fireproof.
•
Install the equipment on a surface that is solid enough to bear the product weight.
•
Put the battery system near the wall and install the locking brackets to prevent the battery
from falling down.
Installation Angle Requirements
•
Install the equipment vertically, no tilt or upside down.
CAUTION
•
Operations such as transportation, turnover, installation and so on must meet the
requirements of the laws and regulations of the country or region where it is located.
•
Move the equipment to the site before installation. Follow the instructions below to avoid
personal injury or equipment damage.
1.
Consider the weight of the equipment before moving it. Assign enough personnel to
move the equipment to avoid personal injury.
2.
Wear safety gloves to avoid personal injury.
3.
Keep balance to avoid falling down when moving the equipment.
5.2.1 Moving the Equipment
5.2 Installing the Battery System
5.2.2 Installing the Battery System