Air Handler / Coil

ELECTRICAL

Line Voltage (Measure L1 and L2 Voltage)

L1 - L2

Secondary Voltage (Measure Transformer Output Voltage)

R - C

Blower Amps     
Heat Strip 1 - Amps     
Heat Strip 2 - Amps     

BLOWER EXTERNAL STATIC PRESSURE

Return Air Static Pressure     

IN. W.C.

Supply Air Static Pressure     

IN. W.C.

Total External Static Pressure (Ig/- from the reading above, add total here)

IN. W.C.

TEMPERATURES

Return Air Temperature (Dry bulb / Wet bulb) 

DB °F

WB °F

DB °F

WB °F

Heating Supply Air Temperature     

DB °F

Temperature Rise

DB °F

Delta T (Difference between Supply and Return Temperatures)

DB °F

Air Handler / Coil - (Inverter Matched)

INVERTER AH / COIL ONLY

Check EEV and EEV wiring is secure (no adjustment required)

Additional Checks

Check wire routings for any rubbing 
Check product for proper draining
Check screw tightness on blower wheel
Check factory wiring and wire connections
Check product for proper clearances as noted by installtion instructions

°F to °C formula: (°F - 32) divided by 1.8 = °C               °C to °F formula: (°C multiplied by 1.8) + 32 = °F

Model Number

Serial Number

Cooling Supply Air Temperature (Dry bulb / Wet bulb)   

Summary of Contents for DOWNFLOW

Page 1: ...PFLOW DOWNFLOW COILS INSTALLATION INSTRUCTIONS 2 1 Handling Use caution when transporting carrying unit Do not carry unit with hooks or sharp object The preferred method of carrying the unit after arr...

Page 2: ...the preferred wrapping material 1 Ensure drain pan hole is NOT obstructed 2 To prevent potential sweating and dripping on finished space it may be necessary to insulate the condensate drain line loca...

Page 3: ...Y RECOMMENDED TO PREVENT SCORCHING OR MARRING OF THE EQUIPMENT FINISH WHEN BRAZING CLOSE TO THE PAINTED SURFACES USE BRAZING ALLOY OF 5 MINIMUM SILVER CONTENT NOTE Refrigerant tubing must be routed to...

Page 4: ...line set into liquid tube expansion and slide grommet about 18 away from braze joint 6 Insert suction line set into suction tube expansion and slide insulation and grommet about 18 away from braze joi...

Page 5: ...onnect manifold set installation is complete NOTE ChecktheSchraderportsforleaksandtightenvalve cores if necessary Install caps finger tight SUBCOOL FORMULA SAT LIQUID LINE TEMP LIQUID LINE TEMP SUPERH...

Page 6: ...ling Along The Panel Gap IMPORTANT NOTE To prevent cabinet sweating and airflow leak apply field provided insulation tape along all joining surfaces between the coil gas furnace duct work and panels S...

Page 7: ...uminum coils TP 109 is also available on the web site in Partner Link Service Toolkit NOTE Ensure coils are rinsed well after use of any chemical cleaners 16 Start Up Procedure WARNING HIGH VOLTAGE DI...

Page 8: ...F Heating Supply Air Temperature DB F Temperature Rise DB F Delta T Difference between Supply and Return Temperatures DB F AirHandler Coil InverterMatched INVERTERAH COILONLY Check EEV and EEV wiring...

Page 9: ...9 THIS PAGE LEFT INTENTIONALLY BLANK...

Page 10: ...10 THIS PAGE LEFT INTENTIONALLY BLANK...

Page 11: ...11 THIS PAGE LEFT INTENTIONALLY BLANK...

Page 12: ...oduct brand you purchased to be directed to the feedback page DAIKIN AMANA BRAND GOODMAN BRAND PRODUCT REGISTRATION Thank you for your recent purchase Though not required to get the protection of the...

Reviews: