Glow-worm economy plus c 30 Instructions For Use, Installation & Servicing Download Page 20

20

221460C

8 Fault Finding

Diagram 8.1

THERMOCOUPLE

Diagram 8.2

GAS VALVE

CONNECTION 'E'

CONNECTION 'D'

BOILER
OVERHEAT
CUT-OFF

CONNECTION 'B'

CONNECTION 'C'

CONNECTION 'A'

2487

2327\A

Re-connect boiler overheat cut-off to points
A and B.  Disconnect thermocouple at point 
D of the gas valve.  Test continuity between 
point C and the body of the gas valve.  
Is there continuity?

Test continuity of thermocouple between inner
connection point D and point E.
Is there continuity?

Faulty boiler overheat cut-off, 
renew.

Thermocouple and boiler overheat circuit 
satisfactory.

NO

YES

YES

Faulty cut-off connectors into gas
valve, either at A or C.
Renew where faulty.

Faulty thermocouple, renew.

With the boiler cold, check connections of the thermocouple, boiler overheat cut-off and gas valve.  
Disconnect overheat cut-off connectors at points A and B at the gas valve, see diagram 3.4.
Test continuity of the overheat cut-off.  Is there continuity?

YES

NO

NO

8.7 Thermocouple and Overheat Cutoff Device

To test the thermocouple, a meter with a range of 0 to 30 mV is
required.

Symptom:  The pilot burner fails to stay alight.  Test the
thermocouple, overheat cutoff and thermocouple connectors,
as described in fault finding chart 8.2, see also diagram 8.1.

Check the millivoltage of the thermocouple closed circuit at
points “A” and “E”, see diagram 8.1. This should be within the
range of 6 to 13mV.

8.8 Electrical

Important: The preliminary electrical systems checks in a
multimeter instruction book are the first checks to be carried out
during a fault finding procedure. On completion of the servicing/
fault finding task which has required the breaking and remaking
of electrical connections then checks, earth continuity, polarity
and resistance to earth must be repeated.

To check the control thermostat and gas valve, see diagram 8.3
and functional flow wiring diagram 8.4.

To check control thermostat pump over run cutoff device circuit
see diagram 8.3 and functional flow wiring diagram 8.5.

8.9 Pilot

Refer to fault finding for pilot, see diagram 8.5.

Summary of Contents for economy plus c 30

Page 1: ...Customer Service number 01773 828100 Our Guarantee gives you peace of mind plus valuable protection against breakdown by covering the cost of Guarantee Registration Open Flue Boiler This is a Cat I2H...

Page 2: ...uels 2 Directive 73 23 EEC on the harmonization of the Laws of the Member States relating to the electrical equipment designed for use within certain voltage limits 3 Directive 89 336 EEC on the appro...

Page 3: ...freezing up If an immersion heater is fitted in the domestic hot water cylinder make sure that it is switched off If you have a sealed water system you should contact your installer servicing company...

Page 4: ...ckage safety device may also need resetting refer to safety device instructions Make sure that the pilot is alight and stable Switch on the electrical supply to the boiler Check that all external cont...

Page 5: ...ons applicable in Scotland local Water Company Byelaws The HealthandSafetyatWorkAct ControlofSubstancesHazardous to Health The Electricity at Work Regulations and any local applicable regulations Deta...

Page 6: ...VC flexible type to the current issue of BS6500 Table 16 not less than 0 75mm2 24 0 20mm 1 9 Draining Tap A draining tap must be provided at the lowest points of the system which will allow the entire...

Page 7: ...moval of the boiler Where the boiler is fitted in a cupboard or compartment permanent high and low level ventilation must be provided The minimum ventilation areas required are given in Table A 2 2 Bo...

Page 8: ...ations for the best product to use When installing a boiler in an existing system whether or not using an inhibitor take special care to drain the entire system including the radiators then thoroughly...

Page 9: ...em that is the height of the highest point of the system above the expansion vessel The water capacity of the boiler is given in Section 1 3 7 Pressure Gauge A pressure gauge with a set pointer and co...

Page 10: ...the domestic hot water cylinder Alternatively provision for make up can be made by using a filling loop 3 10 Filling a Sealed Water System Provision for filling the system at low level must be made T...

Page 11: ...cable clamp When making connections make sure that the earth conductor ismadeofagreaterlengththanthecurrentcarryingconductors so that if the cable is strained the earth conductor would be the last to...

Page 12: ...N L N BROWN BLUE GRN YEL GAS VALVE BROWN BROWN RED RED PURPLE BLUE BROWN BLUE GRN YELLOW CHASSIS EARTH POST 3 7 6 8 9 Remove Red Link between 9 and SL when fitting a time control etc If link is not re...

Page 13: ...R BUTTON G VIEWING WINDOW H GAS RATE ADJUSTMENT SCREW UNDER COVER SCREW J GAS SERVICE COCK K PRESSURE TEST POINT L PILOT BURNER ADJUSTMENT SCREW M FLUE BLOCKAGE SAFETY DEVICE RESET SWITCH M Diagram 6...

Page 14: ...ice or replacing parts isolate the gas and electrical supplies Unless stated otherwise all parts are replaced in the reverse order to removal 7 1 Heating Body Service Remove the controls cover by pull...

Page 15: ...ctor manifold Diagram 7 2 ACCESS FOR SERVICING Diagram 7 3 PILOT ASSEMBLY PILOT INJECTOR ADAPTOR OLIVE PILOT TUBING NUT THERMOCOUPLE NUT IGNITION LEAD clear end ELECTRODE THERMOCOUPLE SECURING SCREWS...

Page 16: ...ownindiagram 7 7 Check the pilot burner flame lengths are as shown in diagram 7 7 7 5 Thermocouple Generally follow the instructions given in Section 7 1 Unscrew the thermocouple nut to release from t...

Page 17: ...ithdraw the phial see diagram 7 8 Remove the control box by undoing the two fixing screws at the front and lower the front of the box until it is clear of the cover Push the box towards the rear of th...

Page 18: ...ew s Inset B Carefully remove phial and capillary through back of boiler Inset C Having opened control box remove the electrical connections from the flue blockage safety device the locknut and capill...

Page 19: ...on maximum control thermostat setting Change faulty overheat cutoff device The correctly set overheat cutoff device operates prematurely There is no air in the heating body and water circulation satis...

Page 20: ...continuity YES NO NO 8 7 Thermocouple and Overheat Cutoff Device To test the thermocouple a meter with a range of 0 to 30 mV is required Symptom The pilot burner fails to stay alight Test the thermoc...

Page 21: ...Device if faulty repair or renew Turn ON thermostat Does main burner light Turn ON thermostat With appliance cold Is there 240V between 7 and N Turn ON thermostat Is there 240V between 7 and N MAIN T...

Page 22: ...ONTROLS IN ORDER Faulty Cable PURPLE between thermostat and terminal block repair or renew Faulty pump inform customer Faulty thermostat renew YES YES YES NO NO NO YES Continued Continued MAIN TERMINA...

Page 23: ...TISFACTORY Does pilot flame envelop thermocouple Check aeration If necessary Clean pilot rectify blockage in pilot injector or replace Check thermocouple circuit using Thermocouple and Boiler Overheat...

Page 24: ...cutoff device 313 064 5 800015 Gas valve assembly inc 14 313 067 6 900000 Thermocouple 394 162 7 203415 Pilot burner inc 12 394 161 8 202600 Electrode 384 149 9 416144 Control thermostat knob 355 401...

Reviews: