19
2000225013B
10 Electrical Connections
10.4 Electrical Connections - Testing
Carry out preliminary electrical system checks as below:
1. Test insulation resistance to earth of mains cables.
2. Test the earth continuity and short circuit of cables.
3. Test the polarity of the mains.
Please ensure the “Benchmark” logbook is completed and left
with the user and the magnetic lighting instructions label is
placed on the surface of the boiler casing.
Diagram 10.4
CONTROL
PANEL REAR
COVER
STRAIN
RELIEF
EXTERNAL
CONTROL
CABLE
MAINS
CABLE
SECURING
SCREW (2)
9808
CABLE
EXIT