206M 201805
5
7. Position and installation:
1. Unscrew the nuts at the bottom, position the machine and calibrate it with the
horizontal rule. Mount the machine with all the screws and to ensure the machine is
stable. Make sure the system is equipped with a good grounding circuit for prevent
electric leakage. And have operation range of ground for skid prevention.
2. Unscrew the nut A on the cabinet body B as shown in
Fig 3
.
Lift the column C; mount it on the machine body B by using the nut A through the bolt
located on the machine body B. If the column becom
e
s loose after a period of using,
tight them immediately. Otherwise the result of damage to the tyre may happen.
8. Electricity and Pneumatic connections:
Caution: Before installation and connection, check to be sure that the electricity
power supply corresponds to the machine technical data. All the installation of
electric and pneumatic devices must be operated by a professional electrician
.
Connect the compressed air connector which is on the machine right side with
compressed air system. The electric grid that the machine connects to must have fuses
protection device and good outer cover grounding protection. Install the leakage
automatic air switch on the maim power supply, leakage current is set at 30mA
Caution: No power plug for this machine, the user should self-connect one power
plug no less than 16A as well as in line with the machine voltage. Or directly
connect with the power supply according to the above requirements
.
9. Adjusting operation:
Turntable Rotation Pedal (Z)
Bead Breaker Pedal (U)
Jaws open and close Pedal (V)
Tread the Turntable Rotation Pedal (Z), Turntable (Y) clockwise rotation; Lift up the Turntable Rotation Pedal (Z),
Turntable (Y) counterclockwise rotation.
Tread Bead Breaker Pedal (U), Bead Breaker shovel (F) close toward inside; release Bead Breaker Pedal (U), Bead Breaker
shovel (F) return to original position.
Tread Jaws open and close Pedal (V), four jaws (G) on the turntable open; tread again, four jaws (G) close. When the pedal
is in the middle position, the four jaws stop moving.
Tyre changer operation is consisted of three parts:
1
)
Breaking the tyre bead
2
)
Demounting the tyre
3
)
Mounting the tyre
Caution: Before any operations, don’t wear loose clothing and wear protective hat, gloves, and skid-proof shoes.
Ensure to exhaust the air in the tyre completely, and remove all the wheel weights from the rim
.
Fig 4