GLOBALJIG INTERNATIONAL S.r.l.
18
4.5.
Lifting platform installation and work area
The LP’s working position must be determined in consideration of the fact that the hydraulic control unit’s tube for
connecting to the LP is 3.5 m in length and connects to the front, on the opposite side to that upon which the vehicles
are loaded.
Perform the following connections:
Flexible oil supply tube (unscrew the male / female caps)
Air tube
Limit switch cable
Connect the electrical power supply (230/400 V - 50/60 Hz tri-phase; or 200 V - 50/60 Hz tri-phase) to the
control unit by means of the appropriate socket.
! NOTE !
For the assembly and use of the vehicle support arms
and the other parts to be inserted upon them,
see the procedures described in chapter 5.
Support base
m. 2.055 x 0.75
Work area
encumbrance
measurements
Towing arm
Towing arm
Summary of Contents for KOALA
Page 1: ......
Page 2: ......
Page 15: ...GLOBALJIG INTERNATIONAL S r l 15 4 3 ...
Page 30: ...GLOBALJIG INTERNATIONAL S r l 30 Annex 02 Electronic board BUTTON PANEL ...
Page 31: ...GLOBALJIG INTERNATIONAL S r l 31 Annex 03 ...
Page 32: ...GLOBALJIG INTERNATIONAL S r l 32 Annex 04 ...
Page 33: ...GLOBALJIG INTERNATIONAL S r l 33 Annex 05 Hydraulic system representation ...
Page 34: ...GLOBALJIG INTERNATIONAL S r l 34 Annex 06 Hydraulic system scheme ...
Page 36: ...GLOBALJIG INTERNATIONAL S r l 36 ...
Page 37: ...GLOBALJIG INTERNATIONAL S r l 37 ...
Page 39: ...GLOBALJIG INTERNATIONAL S r l 39 ...
Page 40: ...GLOBALJIG INTERNATIONAL S r l 40 ...
Page 41: ...GLOBALJIG INTERNATIONAL S r l 41 FRONT ...
Page 42: ...GLOBALJIG INTERNATIONAL S r l 42 ...
Page 46: ...GLOBALJIG INTERNATIONAL S r l 46 ...
Page 48: ...GLOBALJIG INTERNATIONAL S r l 48 ...
Page 49: ...GLOBALJIG INTERNATIONAL S r l 49 ...
Page 50: ...GLOBALJIG INTERNATIONAL S r l 50 ...
Page 55: ...GLOBALJIG INTERNATIONAL S r l 55 ...
Page 56: ......
Page 57: ......