
Global Power Technologies
START-UP AND OPERATION
05585 rev11 | Model 8550-SD
Page 20 of 53
NOTE:
If the TEG is factory new or has just undergone a major overhaul, the Power Unit
output power may drift slightly during the first few weeks of operation. It may be
necessary to adjust the fuel pressure slightly to obtain Set Power after this time.
4.2
APPLYING CUSTOMER LOAD
The TEG should now be operating at the correct power level. Before applying the customer load,
ensure that all wire connections are tight and adjust the power conditioner output to the desired
customer voltage as outlined in Section 9.
To apply customer load:
1.
Connect the customer load to the TEG at terminals 2(+) and 4(-) of terminal block TB-1.
2.
Turn the circuit breaker on the power conditioner to the ON position.
3.
Close and latch the cabinet.
WARNING!
The Power Unit output must always remain connected with the Power Conditioner.
A System Performance Log is located at the end of this manual. Use the log to monitor system
performance each time the site is visited. This information is valuable for future reference. If the site
is a multiple TEG installation, keep the log in a common maintenance area where service technicians
can access it easily during maintenance checks.