Global Power Technologies
1120 - Class I, Division 2, Group D, T3
Date:
Data By:
Site:
TEG Serial No:
1
Time of sustained ignition
2
Time - minutes after ignition
10 20 30 40 50 60
V
set
3
Temp
.
-
max. ambient expected at site
4
Temp
.
-
Present ambient at site
5
Set Up Power -
see Figure 4
6
V
set
-
required to obtain set up power see
Figure 12
7
V
set
-
measured one hour after ignition
8
V
set
-
change necessary to obtain item 6
V
set
. Item 6 minus Item 7
9
Fuel Pressure
-
one hour after ignition
10
Fuel Pressure
-
Change necessary to
obtain Item 6 V
set
.
11
New Fuel Pressure
-
Item 9 plus
Item
10
Time -
of fuel pressure adjust
12
New V
set
-
measured 10 minutes after
fuel adjust for item 11
13
V
set
-
measured 10 minutes after fuel
adjust for item 11
14
Air Shutter Adjustment
ccw
cw
Air Shutter Direction
Time
-
of air shutter adjustment
15
New V
set
-
measured 10 minutes afte
air shutter adjustment
16
V
set
-
measured (final before applying
load)
Date:
Data By:
Site:
TEG Serial No:
1
Time of sustained ignition
2
Time - minutes after ignition
10 20 30 40 50 60
V
set
3
Temp
.
-
max. ambient expected at site
4
Temp
.
-
Present ambient at site
5
Set Up Power -
see Figure 4
6
V
set
-
required to obtain set up power see
Figure 12
7
V
set
-
measured one hour after ignition
8
V
set
-
change necessary to obtain item 6
V
set
. Item 6 minus Item 7
9
Fuel Pressure
-
one hour after ignition
10
Fuel Pressure
-
Change necessary to
obtain Item 6 V
set
.
11
New Fuel Pressure
-
Item 9 plus
Item
10
Time -
of fuel pressure adjust
12
New V
set
-
measured 10 minutes after
fuel adjust for item 11
13
V
set
-
measured 10 minutes after fuel
adjust for item 11
14
Air Shutter Adjustment
ccw
cw
Air Shutter Direction
Time
-
of air shutter adjustment
15
New V
set
-
measured 10 minutes afte
air shutter adjustment
16
V
set
-
measured (final before applying
load)
Notes:
Notes:
1120 TEG Start Up Data Sheet
1120 TEG Start Up Data Sheet
51