
•Page
globalcontract.com
74
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
Flip Top Tables
Legs
Safety Glasses
Allenkeys
Phillips Bit
Spacer Block
3 9/16” x 1 7/8” (included)
Drill
Measuring Tape
Wrench
Required Tools
Pre Assembled Components
1. Connect the leg to cross beam.
Legs
Cable Release/Support Beams
Cross Beam
2. Snap on black plastic cover to
conceal
connection.
3. Snap support block into channel
on top of cross beam.
Pivot Bracket
4. Remove end cap from the end
of the support beam.
5. Ensure pivot bracket is installed 3 9/16” from the end of the extrusion. Replace the end cap.
6. Connect the base to the support beam.
Insure that black nylon washers (A) are installed between the pivot bracket and the assembly.
3
9/16”
A
B
C
A
Summary of Contents for Licence 2
Page 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Page 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Page 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Page 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Page 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Page 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Page 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Page 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Page 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Page 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...