
•Page
globalcontract.com
22
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
Assembly
L2GBxxL
Safety Glasses
Required Tools
Screwdriver #2 Phillips
Rubber Mallet
Screwdriver Roberson
Level
Included Hardware
Blum Connector
(installed) L005650061
Wood Screw #8 3/4
L007250032
Flat Bracket
L005651035
L2GRxxR
STEP 1: Unpack and inspect individual pieces for damages or missing hardware
STEP 2: Pick a clean unobstructed area to assemble desk. It is advisable to as-
sembly of this product upright.
STEP 3. Install levellers into T nuts, using mallet install into pre-drilled holes on the
bottom of gable.
Orient the gables as left and right with exposed hole on back edge facing back, note
that the large end panel is handed.
a. Install Blum Connector screws into pre-drilled holes on back and top
edge of both the partial gable. Please note that the half gable is non
handed, there will be 2 holes for each Blum connector screw location.
Install screws in position closest to underside of assembled desk.
STEP 4: On the worksurface, install Blum Connector screws in pre-drilled holes on
the back edge and side matching the full height end panel.
STEP 5: Lay worksurface face down on Clean unobstructed surface with Blum
Connectors exposed.
Attach half gable to worksurface linming Blum Connectors screws with Blum Con-
nectors. Tighten Blum Connector ¼ turn, do not over tighten.
a. Lay full end panel on clean unobstructed surface with exposed Blum
Connectors facing up. Connect worksurface to full end panel by lining up
Blum connecter screws to the Blum connectors on end panel. Tighten Blum
connectors ¼ turn, do not over tighten.
STEP 6: Lay the back panel on clean unobstructed surface with Blum Connectors
facing up. On the bottom edge, install the levellers into the T nut inserts.
STEP 7: Pick up assembly of the worksurface and end gables and line up Blum
Connector screws along the back edge to the Blum connectors on the back panel.
Tighten Blum Connector screws ¼ turn, do not over tighten. Stand Assembly
upright.
STEP 8: This unit is intended to be attached to an adjoining assembled unit at open
side using the provided Flat Brackets. The Flat Brackets are screwed into ganged
assemblies at the worksurface joint using #8 x ¾ wood screws
Half fl at bracket will be installed in “cableway” opening of half gable.
a. Using Connector Bolt screw and Connector Nut, join half gables of
adjoin units though pre-drilled hole on the side of the gable.
STEP 9: When fi nal position has been located, level the unit with the levellers
installed on the pedestal.
#4 & 5 Hex Wrench
Installation For Similar Products
Leveler
L007250037
“T” Nut Insert
L007250039
Blum Connector
Screw L005650060
Flat Bracket
L005650025
Connector Bolt
L005650114
Connector Nut
L005650117
HALF GABLE
BACK PANEL
WORKSURFACE
END GABLE
Summary of Contents for Licence 2
Page 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Page 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Page 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Page 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Page 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Page 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Page 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Page 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Page 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Page 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...