
•Page
globalcontract.com
20
GLOBAL
Contract
• Fall 2017
INSTALLATION GUIDELINES
NOTE: Open and assemble only one product
at a time to avoid a potential mix-up of parts
and hardware.
It is adviseable to assemble the unit on a
carpet to avoid scratches.
Assembly
Safety Glasses
Required Tools
Screwdriver #2 Phillips
Rubber Mallet
Screwdriver Roberson
Level
#4 & 5 Hex Wrench
Included Hardware
Blum Connector
(installed) L005650061
Flat Bracket
L005651035
STEP 1: Unpack and inspect individual pieces for damages or missing hardware
STEP 2: Pick a clean unobstructed area to assemble desk. It is advisable to as-
sembly of this product upright.
STEP 3: Install levellers into T nuts, using mallet install into pre-drilled holes on the
bottom of gable. Orient the gables as left and right with exposed drill holes on back
edge facing back.
Install Blum Connector screws into pre-drilled holes on back edge closest to under-
side of desk assembly.
a. install Blum Connector Screws on top edge of partial gables into pre-
drilled holes closest to underside of desk assembly.
STEP 4: On the worksurface, install Blum Connector screws in pre-drilled holes on
the back edge.
STEP 5: Lay worksurface bottom side up on clean unobstructed surface with Blum
Connectors facing up.
Install partial gables into Blum Connectors on the bottom of the surface. Insure
that the gables have Blum Connector screws facing underside of desk as confi gured
in step 3. Tighten Blum connectors ¼ turn, do not over tighten.
STEP 5: Lay the back panel on clean unobstructed surface with Blum Connectors
facing up. On the bottom edge, Install levellers into T nuts, using mallet install into
pre-drilled holes.
STEP 6: Pick up assembly of the worksurface and end gables and line up Blum
Connector screws along the back end to the Blum connectors on the Back panel.
Tighten Blum Connector screws ¼ turn, do not over tighten. Stand Assembly
upright.
STEP 7: This unit is intended to be attached to an adjoining assembled unit at both
ends using the provided Flat Brackets. The fl at brackets are screwed into ganged
assemblies at the worksurface joint using #8 x ¾ wood screws
half fl at bracket will be installed in “cableway” opening of partial gable.
a. Using Murikoshi Connector screw and ¼ - 2—2 Bolt, join half gables of
adjoin units though pre-drilled hole on the side of the gable.
Leveler
L007250037
Blum Connector
Screw L005650060
Flat Bracket
L005650025
Connector Bolt
L005650114
Connector Nut
L005650117
Wood Screw #8 3/4
L007250032
HALF GABLE
HALF GABLE
BACK PANEL
“T” Nut Insert
L007250039
WORKSURFACE
L2GB
Summary of Contents for Licence 2
Page 6: ...Page globalcontract com 5 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Page 8: ...Page globalcontract com 7 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Page 10: ...Page globalcontract com 9 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4...
Page 18: ...Page globalcontract com 17 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 5 4 3...
Page 20: ...Page globalcontract com 19 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 4 6 5 6a 7 8 9...
Page 22: ...Page globalcontract com 21 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 6 4 3 5 3a...
Page 24: ...Page globalcontract com 23 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3a 5a 3 4 5 6 3...
Page 46: ...Page globalcontract com 45 Fall 2017 GLOBALContract INSTALLATION GUIDELINES...
Page 94: ...Page globalcontract com 93 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 5 6 7 9 10 4...
Page 96: ...Page globalcontract com 95 Fall 2017 GLOBALContract INSTALLATION GUIDELINES 3 2 5 7 8...