PART TWO - INSTALLATION
SECTION 2 - MECHANICAL REQUIREMENTS
Model P53 pH/ORP Analyzer (universal-mount 1/2 DIN)
Rev. 6-501
22
FIGURE 2-2 Analyzer Installation Dimensions Details
2.3 Conduit Hole
Requirements
☞
Recommendation:
Run all wiring to the analyzer in 1/2-
inch, grounded metal conduits. If using only shielded ca-
bles, appropriate strain reliefs or cable grips are required.
(GLI offers accessory cable grips, part number 3H1091, and
watertight locknuts, part number 3H1230, for cable entries.)
Seal unused cable entry holes with appropriate plugs.
NOTE:
Use NEMA 4-rated fittings and plugs to maintain the
watertight integrity of the NEMA 4X enclosure.