background image

Page 24

TERMS AND CONDITIONS

Gledhill

 (Building Products) 

Ltd

  

AMD.DECEMBER 2013

 

 

CONDITIONS OF SALE & GUARANTEE TERMS

1.

 

Gledhill (Building Products) Ltd (“We” or “Gledhills”) only do business upon the Conditions which appear below 

and no other.  Unless we so agree in writing these Conditions shall apply in full to any supply of goods by us to the 
exclusion of any Conditions or terms sought to be imposed by any purchaser.  These Conditions of Sale and Warranty 
Terms override those which are contained on the Invoice Forms and all Sales are now subject to these Conditions of 
Sale and Warranty terms only.

2. PRICE

Once an order or call off has been accepted the price will be held for three months 

but if delivery is extended 

beyond that period at the customer’s request, then we reserve the right to amend the price when necessary.

  

The company reviews its pricing annually to adjust for changes in our cost base.  We reserve the right to alter prices 
at any time for severe movements in raw materials (mainly copper and steel).  If there is to be a change we will give 
customers at least four weeks notice but anything delivered after that date will be at the revised price.  An order 
may not be cancelled or varied after acceptance without the written consent of the company.  Such cancellation or 
variation shall be subject to such reasonable charges as may be appropriate.

3. SPECIFICATION

The goods are supplied in accordance with the Specifications (if any) submitted to the Purchaser and any additions 
and alterations shall be the subject of an extra charge.  Any goods not so specified shall be in accordance with 
our printed literature or the literature of any of our component suppliers (subject to any modifications made since 
publication).  If we adopt any changes in construction or design of the goods, or in the specification printed in our 
literature, the Purchaser shall accept the goods so changed in fulfilment of the order.

4. PAYMENT

The buyer shall make payment in full within thirty days from the end of the month in which the invoice is dated.  If 
we receive payment in full on or before the due date we will allow an appropriate settlement discount except where 
we have quoted a special net price.  If payment is not received in full on or before the due date we shall be entitled 
in addition to the invoice price to:
(i) 

payment of a sum equal to any increase in the copper price supplement applicable to the particular goods sold 
between the date of receipt of order and the date of receipt of payment in full; and 

(ii) 

interest on any part of the invoice price unpaid after the due date at the rate of 3% per annum over the base 
rate for the time being of HSBC Bank plc.

5. TIME

We give estimates of delivery dates in good faith and time of delivery is not nor shall be made of the essence of any 
contract nor shall we be liable for any loss or damage occasioned by delay in delivery.

6. DELIVERY

We deliver free normally by our own vehicles within 25 miles of any of our manufacturing depots.  Delivery to any 
place more than 25 miles from one of our manufacturing depots may be subject to our quoted delivery charges.  We 
reserve the right to make delivery of goods contained in one order by more than one consignment and at different 
times.  Where a period is agreed for delivery and such period is not extended by our Agreement, the Purchaser shall 
take delivery within that period.    If the Purchaser fails to take delivery, we shall be entitled at the Purchaser’s risk 
and expense to store the goods at the Purchaser’s premises or elsewhere and to demand payment as if they had 
been despatched.  Off loading at point of delivery shall be the responsibility of and be undertaken by the Purchaser.

7. 

SHORTAGES OR DAMAGE

Goods must be inspected before signature of delivery note and any damage, shortage or discrepancy noted on the 
delivery note and the goods returned on the same vehicle.  The buyer must also give us immediate written notice of 
the damage, shortage or discrepancy so that we may prompt investigation.

8. 

RETURN OF GOODS

Goods may not be returned to the Company except by prior written permission of an authorised officer of the 
Company and such return shall be subject to payment by the Purchaser of handling and re-stocking charges, 
transport and all other costs incurred by the Company.

9. 

COMPANY LIABILITY AND GUARANTEE

9.1.  Subject to the terms of these Conditions of Sale and Guarantee Terms Gledhills provide Guarantees in respect 

of specific products as set out in this clause.

9.2.  Each Guarantee is strictly conditional upon the following:-
9.2.1.  Complaints must be given to us immediately, before any action is taken, as responsibility cannot be accepted 

if repairs or renewals are attempted on site without our written approval.

9.2.2.  The unit has been installed in accordance with our installation and service instructions and all relevant codes 

of practice and regulations in force at the time of installation.

9.2.3.  All necessary inlet controls and safety valves have been fitted correctly. 
9.2.4.  The unit has only been used for the storage of potable water supplied from the public mains. The water quality 

shall be in accordance with European Council Directive 98/83 EC, or revised version at the date of installation, 
and is not fed with water from a private supply. Particular:

 

Chloride content: 

Max. 200 mg/l

 

Sulphate content: 

Max. 200 mg/l

 

Combination chloride/sulphate: 

Max. 300 mg/l (in total)

9.2.5  Where appropriate the unit has been regularly maintained as detailed in the installation and service instructions 
9.2.6.  Defects caused by corrosion or scale deposits are not covered by any Guarantee.
9.2.7.  Where we agree to rectify any defect we reserve the right to undertake the work on our own premises.
9.2.8. We will not accept any labour charges associated with replacing the unit or parts for any of the following 

products listed.

9.2.9.  If the newly fitted water heater is not in regular use then it must be flushed through with fresh water for at least 

15 minutes. Open at least one hot water tap once per week, during a period of at least 4 weeks.

9.3.  Guarantees are provided in respect of specified goods supplied by Gledhills as follows:- 

(a)  Domestic and Commercial Open Vented Cylinders and Tanks.

 

The storage vessel is guaranteed for ten years and if it proves to be defective either in materials or workmanship, 
we will either repair or supply replacement at our option with the closest substitute in the case of any obsolete 
product to any address in Great Britain.

  (i)    free of all charge during the first year after delivery by us.
  (ii)  thereafter at a charge of one-tenth of the then current list price and any copper price supplement and 

delivery charge during the second year after delivery by us and increasing by a further one-tenth on the 
second and subsequent anniversary of delivery by us.

(b)  Domestic Mains Fed Products [Primary Stores]

 

The storage vessel is guaranteed for five years and if it or any integral pipework as part of the storage vessel 
assembly proves to be defective either in materials or workmanship, we reserve the right to either repair or 
supply replacements or the closest possible substitute in the case of any obsolete product and will collect and 
deliver to any address in England, Wales and Scotland (excluding all Scottish Islands).

  (i)  free of all charge during the first year after delivery 

by us.

 (ii) thereafter at a charge of one-fifth of the then current 

list price or any copper price supplement and 
delivery charge during the second year after delivery 
by us increasing by a further one-fifth on the second 
and subsequent anniversary of delivery by us.

 

(c)  StainlessLite Unvented Cylinders

 

Gledhill guarantee the components including controls, 
valves and electrical parts for two years from the date 
of purchase.  IT SHOULD BE NOTED THAT THE FACTORY 
FITTED TEMPERATURE AND PRESSURE RELIEF VALVE 
MUST NOT BE REMOVED OR ALTERED IN ANY WAY OR 
THE GUARANTEE WILL NOT BE VALID.  GLEDHILL WILL 
NOT BE RESPONSIBLE FOR ANY CONSEQUENTIAL LOSS 
OR DAMAGE HOWEVER IT IS CAUSED. 

 

The guarantee for the stainless steel vessel is 
for twenty five years against material defect or 
manufacturing faults if the original unit is returned to 
us AND PROVIDED THAT:   

  (i)  It has not been modified, other than by Gledhill.
  (ii)  It has not been subjected to wrong or improper 

use or left uncared for.

  (iii) It has only been used for the storage of potable 

water supplied from the public mains, max 
200mg/litre chloride.

  (iv)  It has not been subjected to frost damage.
  (v)  The benchmark service record is completed after 

each annual service.

  (vi)  The unit has been serviced annually.
  (vii) Any disinfection has been carried out strictly in 

accordance with BS6700.

 

If the stainless steel vessel proves to be defective 
either in materials or workmanship we reserve the 
right to either repair or supply replacements or the 
closest possible substitute in the case of any obsolete 
product and will collect and deliver to any address in 
England, Scotland and Wales (excluding all islands):

  (i)  free of charge during the first year after delivery by 

us.

  (ii)  thereafter at a charge of one twenty fifth of the 

then current list price during the second year 
after delivery by us and increasing by a further 
one twenty fifth on the second and subsequent 
anniversary of delivery by us.

 

ACTION IN THE EVENT OF FAILURE  

 

We will require the return of a cylinder which develops 
a leak for inspection. If our examination confirms a 
failure then an appropriate level of credit against the 
cost of the original cylinder will be issued in line with 
the terms of our warranty.

Please note:

  -    Installation must have been carried out by a 

licensed specialized company (heating contractor 
or plumber) following the version of installation 
instructions in force.

  - 

  Gledhill or its representative was given the 

opportunity to check complaints on site 
immediately after any defect occurred.

 - 

 Confirmation exists that the system was 

commissioned properly and  that the system 
was checked and maintenance was performed 
annually by a specialised company licensed for 
this purpose.

(d) Components of our products other than 
Storage Vessels and Integral Pipework.  

 

We will either extend to the purchaser the same terms 
of warranty as we are given by the manufacturer of the 
component or if the manufacturer does not give any 
warranty, replace free of charge any component which 
becomes defective within two years after the date of the 
delivery by us and is returned to us at the purchaser’s 
expense but we shall not meet the cost of removal or 
shipping or return of the component or any other cost 
charges or damages incurred by the purchaser.

9.4. 
9.4.1. In respect of goods supplied by us  and in respect of 

any installation work carried out by or on our behalf, 
our entire liability and the purchaser’s sole remedies 
(subject to the Guarantees) shall be as follows:-

  (a)  We accept liability for death or personal injury to 

the extent that it results from our negligence or 
that of our employees

Summary of Contents for PulsaCoil PCBP 120

Page 1: ... Servicing Instructions Models covered in this manual PulsaCoil PCBP 120 PulsaCoil PCBP 150 PulsaCoil PCBP 180 PulsaCoil PCBP 220 PulsaCoil BP Hot water cylinder utilising off peak electric with an optional solar version ...

Page 2: ...ill product and we hope you get satisfactory service from Gledhill If not please let us know Benchmarkplacesresponsibilitiesonbothmanufacturersandinstallers Thepurposeisto ensure that customers are provided with the correct equipment for their needs that it is installed commissionedandservicedinaccordancewiththemanufacturersinstructions by competent persons and that it meets the requirements of th...

Page 3: ...artofthedomesticwaterinstallations The PulsaCoil BP is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience or knowledge unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety Children should be supervised to ensure that they do not play with the applian...

Page 4: ...00ppm provision should be made to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce the rate of accumulation of lime scale To comply with this requirement the hardness of the mains water should be checked bytheinstallerandifnecessarytheoptionalfactoryfittedin linescaleinhibitorshould be specified at the time of order for hardness levels between 200 an...

Page 5: ...roximately 52 C at the bath flow rate of 18 litres min recommended by BS 6700 The temperature is user adjustable Technical Specification Description PCBP 120 PCBP 150 PCBP 180 PCBP 220 Appliance height mm 1131 1332 1533 1734 Appliance width mm 560 560 560 560 Appliance depth mm 605 605 605 605 Appliance weight empty kg 54 63 69 78 Approx weight full kg 172 205 234 268 Total volume nominal litres 1...

Page 6: ...pupcistern not shown Note Both immersion heaters are low watts density type with incaloy 825 sheaths and are specially manufactured to suit Thermal Stores It is recommended that any replacements should be obtained from Gledhill Building Products Optional Extra Equipment In line scale inhibitor for mains water services with hardness levels between 200 and 300ppm mg l fitted but ready for wiring by ...

Page 7: ...D Width E Depth F PCBP 120 1881 600 620 PCBP 150 2082 600 620 PCBP 180 2283 600 620 PCBP 220 2484 600 620 Note The Appliance dimensions above do not allow for the100mm high installation base The following table of minimum cupboard dimensions only allow the minimum space requiredfortheappliance includingthetopup cistern Any extra space required for shelving etc in the case of airing cupboards etc m...

Page 8: ...ified If a warning overflow pipe is NOT provided the F E Cistern should be filled from a temporary hose connection incorporating a double check valve This can be from a temporary hose connection supplied from a cold water tap or a permanent cold branch provided adjacent to theTop up Cistern The temporary connection must be removed once the appliance is filled Note All dimensions are shown in mm an...

Page 9: ...ptionalpolyphosphate type inhibitor should be specified at the time of order However this will need to be fitted by the installer at a suitable point in the cold water supply to the appliance The hot water flow rate from the PulsaCoil BP is directly related to the adequacy of the cold water supply to the dwelling This must be capable of providing for those services which could be required to be su...

Page 10: ...o the use of BS EN Standard copper pipework and fittings Taps Shower Fittings Aerated taps are recommended to prevent splashing Any type of shower mixing valve can be used as long as both the hot and cold supplies are mains fed However all mains pressure systems are subject to dynamicchangesparticularlywhenotherhotandcoldtaps showersareopened and closed which will cause changes in the water temper...

Page 11: ...ost facility is reduced if a better off peak tariff can be agreed with the electrical supply company see Model Selection Guide on page 5 The typical wiring arrangement is shown in figure 1 7 An economy 7 controller eg Horstman Electronic 7 is used for a manual boost and automatic off peak heating of hot water If a factory fitted scale inhibitor has been specified thenitshouldbewiredtoapermanent su...

Page 12: ... its design temperature Cupboardtemperatureswillnormallybeslightlyhigherthaninaconventionalsystem and the design of the cupboard and door will need to take this into account No ventilation is normally required to the cupboard The separate Top up cistern will need to be located on top of the appliance or at high level in the cupboard housing the PulsaCoil BP The dimensions and clearances are provid...

Page 13: ... for slings lifting beams etc Beforeinstallationthesiterequirementsshould be checked and confirmed as acceptable The plastic cover and protective wrapping shouldberemovedfromtheapplianceand the installation base provided placed in position Theappliancecanthenbeliftedintopositionin the cupboard on top of the base and the front panelremovedbyunscrewingthe2screwsand liftingthedoorupandout readyforcon...

Page 14: ...open vent B 15mm Cold feed expansion C 22mm Incoming mains cold water D 22mm Domestic hot water E Drain tap connection Note The safety open vent and cold feed expansion must be connected to the top up cistern using the pipework assembly provided Do not alter or connect any pressure relief device to the vent pipe of this water heater All factory made joints should be checked after installation in c...

Page 15: ...as supplied should be used to connect to the top up cistern and pipework site run by the installler to connect this to the appliance Obviously any pipework in the roof space and the feed and expansion cistern will need to be adequately insulated to protect against frost damage Combined feed and open pipe arrangements must not be used No valves should be fitted in the safety open vent which must be...

Page 16: ...abel if it is a manual fill model If the optional level gauge has been provided the level will be shown by the red float Ifaballvalveisprovided turndowntheservicingvalveoncethesystemisfinally filled to the point where the warning overflow pipe will cope with the discharge arising from a ballvalve failure If an overflow is not provided ensure the temporary filling hose is isolated and removed from ...

Page 17: ...3 bar 2 DO check the flow rate of the incoming cold water main is adequate to meet the maximum hot and cold water simultaneous demands 3 DO check that all connections are in accordance with the labelling on the thermal store 4 DO NOT switch on the immersion heaters until you have checked that the appliance is full of water ie there is water in the top up cistern 5 DO check the water level is corre...

Page 18: ...with dual control safety thermostat XB482 2 Bottom immersion heater Incalloy 825 immersion heater with dual control safety thermostat XB482 3 Brawa mix thermostatic hot water blending valve XC007 4 Scale inhibitor PCB XB142 5 11 Safety Rod Stat XB114 4 3 1 2 SERVICING SHORT PARTS LIST ...

Page 19: ...Stourbridge West Midlands DY8 1PA TELEPHONE 01384 442611 FAX 01384 442612 Water Savings Water Related Costs Can Be Reduced By Good Plumbing Practice TAPS MIXERS SHOWERS Unregulated 25 30 l m Regulated 10 12 l m Over 20 l m 5 6 or 8 l m 2 tap half open Fitted with regulator Unregulated 4 Fixing Options For Taps Mixers 1 MK Range Combined Regulators Aerator forscrewingontoTaps Mixerswithinternal ore...

Page 20: ...Page 20 APPENDIX APPENDIX B ...

Page 21: ...two persons to have a purposely designed hold at the top of the appliance to ensure easy lifting at the top of the product e Taking the lead for team lifts As more than one person is required for these products ensure that one person is taking the lead This may be you so ensure that each person that is helping is made aware of the weight and of the items listed within this assessment Make sure you...

Page 22: ...Page 22 NOTES ...

Page 23: ...Page 23 NOTES ...

Page 24: ...on chloride sulphate Max 300 mg l in total 9 2 5 Whereappropriatetheunithasbeenregularlymaintainedasdetailedintheinstallationandserviceinstructions 9 2 6 Defects caused by corrosion or scale deposits are not covered by any Guarantee 9 2 7 Where we agree to rectify any defect we reserve the right to undertake the work on our own premises 9 2 8 We will not accept any labour charges associated with r...

Page 25: ... i the Purchaser shall hold the goods in a fiduciary capacity for us and shall store the same separately from any other goods in the Purchaser s possession and in a manner which enables them to be identified as our goods ii the Purchaser shall immediately return the goods to us should our authorised representative so request All the necessary incidents associated with a fiduciary relationship shal...

Page 26: ...Other Is the cylinder solar or other renewable compatible Yes No What is the hot water temperature at the nearest outlet C All appropriate pipes have been insulated up to 1 metre or the point where they become concealed Yes UNVENTED SYSTEMS ONLY KHUH LV WKH SUHVVXUH UHGXFLQJ YDOYH VLWXDWHG LI WWHG What is the pressure reducing valve setting bar DV D FRPELQHG WHPSHUDWXUH DQG SUHVVXUH UHOLHI YDOYH D...

Page 27: ...ame Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date Engineer name Company name Telephone No Comments Signature SERVICE 02 Date Engineer name Company name Telephone No Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Comments...

Page 28: ...mer support with a range of services including Low cost annual repair and maintenance contracts direct from Gledhill Annual servicing and safety checks Expert response to out of warranty breakdowns at fixed charges Please call 08445 679898 or visit www gledhill net for further details Only the best is acceptable FM 02057 To protect our environment we use copper a totally recyclable metal which nev...

Reviews: