Page 17
Annual Service
No annual servicing of the PulsaCoil BP is
necessary.
However, if required, the operation of the
controls and a hot water performance test can
be carried out to prove the appliance is working
satisfactorily and within its specifi cation.
If it is decided to carry out the above tests the
water level in the top cistern should also be
checked and if necessary topped up.
Changing Components
Free of charge replacements for any faulty
components are available from Gledhill during
the in-warranty period on return of the faulty
part (normally 12 months).
After this, spares can be obtained direct from
Gledhill using the ‘Speed Spares’ service, or
through any of the larger plumbers merchants/
specialist heating spares suppliers.
Help and advice is also available from the
Technical Helpline on 01253 474584. Please
note this is a premium rate line and will be
charged accordingly.
However, all components are readily accessible
and can be changed quickly and easily by the
installer using common plumbing/electrical
practice.
However all maintenance work on the
PulsaCoil BP appliance must be carried out by
a competent trades person.
Important Do’s and Don’ts
1.
DO
check the incoming mains water pressure. The preferred range of mains
pressure is 2 -3 bar.
2.
DO
check the fl ow rate of the incoming cold water main is adequate to meet the
maximum hot and cold water simultaneous demands.
3.
DO
check that all connections are in accordance with the labelling on the thermal
store.
4.
DO NOT
switch on the immersion heaters until you have checked that the
appliance is full of water ie there is water in the top up cistern.
5.
DO
check the water level is correctly set in the top up cistern when cold and (if
fi tted) that there is no discharge from the overfl ow when the appliance is up to
temperature.
6.
DO
check that the immersion heater thermostats are set at approx 75°C (factory
set).
7.
DO
insulate any exposed hot water pipework in the PulsaCoil BP cupboard and
appliance.
8. If the ballvalve in the F & E cistern is permanently connected to the mains cold
water supply
DO
plumb the overfl ow/warning pipe in a 20mm internal diameter
pipe and ensure it discharges in a conspicuous external position. Use a material
which is suitable for use with heating F & E cisterns in accordance with BS 5449
(such as copper).
9.
DO
ensure that the functioning and control of the system is explained to the
occupant.
10.
DON’T
place any clothing or other combustible materials against or on top of this
appliance.
These instructions should be placed along with the component manufacturers
instructions in the pocket provided on the top of the appliance. The appliance
should be left with the front panel fi tted and screwed in position.
SERVICING
SERVICING
Summary of Contents for PulsaCoil PCBP 120
Page 20: ...Page 20 APPENDIX APPENDIX B ...
Page 22: ...Page 22 NOTES ...
Page 23: ...Page 23 NOTES ...