Page 16
Open the incoming stop valve and fi ll the domestic mains cold and hot water systems
including the PulsaCoil BP appliance.
Check the water level in the top up cistern and if a ballvalve is fi tted adjust if necessary.
Check the whole of the domestic hot and cold distribution systems for leaks. Fully
fl ush and if necessary chlorinate the hot and cold water system in accordance with
the recommendations in the Water Regulations and BS 6700.
Please note that the whole of the domestic hot and cold water systems including the
appliance must be adequately fl ushed after chlorination. Failure to do this can cause
damage to the exchangers/immersion heaters etc. If there are any doubts regarding
this or the quality of the water being used to fi ll the PulsaCoil BP appliance an inhibitor
such as Fernox MBI or Sentinel X100 should be added to the appliance when fi lling in
line with the manufacturers instruction for these products.
It is
most important
to check that the top up tank is fi lled up to the water level shown
on the label, if it is a manual fi ll model. If the optional level gauge has been provided,
the level will be shown by the red fl oat.
If a ballvalve is provided, turn down the servicing valve once the system is fi nally
fi lled to the point where the warning/overfl ow pipe will cope with the discharge
arising from a ballvalve failure.
If an overfl ow is not provided ensure the temporary fi lling hose is isolated and
removed from its connection to the cold water supply.
It is essential that all systems function properly for optimum performance and if
necessary, adjust the thermostatic blending valve to control the hot water outlet
temperature between 50°C-55°C.
To achieve this the fl ow rate from each tap should be checked and a suitable number of
taps run simultaneously to check the impact of this on the fl ow rate at individual taps.
We recommend that fl ow regulators are provided for each tap/terminal fi tting
to ensure that the available fl ow is shared evenly - See Appendix A for further
details.
At the time of commissioning, complete all relevant sections of the Benchmark
Checklist located on the inside back pages of this document.
This must be completed during commissioning and left with the product to meet
the Warranty conditions off ered by Gledhill.
INSTALLATION
COMMISSIONING
Summary of Contents for PulsaCoil PCBP 120
Page 20: ...Page 20 APPENDIX APPENDIX B ...
Page 22: ...Page 22 NOTES ...
Page 23: ...Page 23 NOTES ...