background image

Glastender, Inc.   5400 North Michigan Road   Saginaw, MI.   48604-9780

800.748.0423   989.752.4275   Fax: 989.752.4444   www.glastender.com

BIK-E

Beer Panel Installation Instructions

F-750-361 Rev. A

These instructions assume that the primary regulator and CO2 line to the walk-in cooler are already installed.

1.  Position the regulator panels according to factory instructions.
2.  Connect CO2 source line to one end of regulator bank (A). If there is more than one panel, continue the line 

to the next panel until all panels are connected

3.  Attach an Empty Keg Detector (B) to each of the black EKD mounting brackets by sliding them in place. The 

EKD can be mounted to flow left or right.

4.  Approximately 9 feet of clear vinyl beer line (C) is provided for the keg jumper line from each keg to its 

EKD. Trim clear line to size and attach one end to bottom input port of the EKD and the other end to the keg 

tap.

5.  Approximately 9 feet of red air line (D) is provided for the jumper line from each keg to its regulator (E). 

Trim red air line to size and attach one end to the regulator and the other end to the keg tap.

6.  Attach the polyline (F) from the beer line set (conduit) to the side output port of each EKD.
7.  Approximately 6 feet of exhaust line (G) is provided for the exhaust port of each EKD. Trim the exhaust 

line to length and attach to each EKD exhaust port so the exhaust can be drained to a bucket. No clamp is 

required.

8.  The keg regulators (E) provide individual pressure to each keg. Upon start up, the ideal gauge pressure will 

depend on the type of gas involved as well as the length of the line runs. The goal is to achieve a flow rate of 

2 ounces per second.

A

F

E

B

C

D

G

04-06-06

Summary of Contents for BIK

Page 1: ...06 BPIK EY Beer Pump Panel with Empty Keg Detector Y Angle Bracket Page 5 BPIK E Beer Pump Panel with Empty Keg Detector Page 3 BPIK Y Beer Pump Panel with Y Angle Bracket Page 4 BPIK Beer Pump Panel...

Page 2: ...exhaust port connection F Use the CO2 line provided to exit the CO2 from the walk in cooler An extra tee is provided with each panel in case you want to join the exhaust lines of adjacent panels THE E...

Page 3: ...the polyline G from the beer line set conduit to the side output port of each EKD 8 Approximately 6 feet of exhaust line H is provided for the exhaust port of each EKD Trim the exhaust line to length...

Page 4: ...to the top output ports of each Y angle bracket 7 The CO2 exhaust port of each pump has been pre plumbed at the factory to create one CO2 exhaust port connection H Use the CO2 line provided to exit th...

Page 5: ...ropriate EKD side output port using a black washer 8 Attach the polyline I from the beer line set conduit to the top output ports of each Y angle bracket 9 Approximately 6 feet of exhaust line J is pr...

Page 6: ...yl beer line B is provided for the keg jumper line from each keg to its angle bracket C Trim clear line to size and attach one end to bottom of angle bracket and the other end to the keg tap 4 Approxi...

Page 7: ...r the keg jumper line from each keg to its EKD Trim clear line to size and attach one end to bottom input port of the EKD and the other end to the keg tap 5 Approximately 9 feet of red air line D is p...

Page 8: ...f Y angle bracket and the other end to the keg tap 4 Approximately 9 feet of red air line D is provided for the jumper line from each keg to its regulator E Trim red air line to size and attach one en...

Page 9: ...e E is provided for the keg jumper line from each keg to its EKD Trim clear line to size and attach one end to the bottom input port of the EKD and the other end to the keg tap 6 Approximately 9 feet...

Reviews: