22
Model: GVH-C & GVH-F
Installation
2.07
Final Installation - continued
1. Confirm that both the hood and cooking appliances are
properly wired and that installation of the fire suppression
system is complete.
2. Ensure that the hood is located in the final operating
location.
3. Level the unit side to side, front to back and corner to
corner. Adjust the leveling legs by rotating the lower foot
portion of the leg ... turning to the right shortens it,
turning to left lengthens it.
4 After unit is level, use appropriated technique and
hardware to anchor it to the floor. Floor plates on the
front legs are for this purpose.
Floor-Stand Installation (GVH-F)
Summary of Contents for GVH-C
Page 2: ......
Page 4: ......
Page 13: ...3 Model GVH C GVH F Introduction 1 04 1 Overall Dimensions GVH F Floor Stand Version ...
Page 18: ...8 Model GVH C GVH F Installation 2 03 2 GVH Floor Stand Hood GVH F ...
Page 34: ...Model GVH C GVH F Overview 24 1 5 2 4 3 8 9 3 01 Control Panel 6 7 ...
Page 49: ...39 Model GVH C GVH F Operation Filter Maintenance ...
Page 56: ...46 Model GVH C GVH F Troubleshooting ...
Page 64: ...54 Parts List Model GVH C GVH F 7 05 Under Hood Components 2 1 4 3 ...
Page 66: ...56 Model GVH C GVH F Parts List ...
Page 67: ......