03_28
Periods of inactivity
We recommend carrying out the following operations:
1. General cleaning of the vehicle.
2. With engine off and pistons at bottom dead centre,
remove the spark plug
, intro-
duce through its hole 1 ÷ 2 cc of
SELENIA HI SCOOTER 2 Tech
. Then, operate the
engine start-up pedal 3-4 times making the engine work slowly and reassemble the
spark plug.
3. Remove the fuel from the vehicle: coat the unpainted metal parts with antirust
grease: keep the wheels off the ground, by resting the chassis on two wooden sup-
ports.
4. For the battery, follow the standards listed in the booklet.
5. Drain the petrol from the carburettor tank through the bleed tap.
CAUTION
THE CHARGE MUST BE MADE WITH A CURRENT EQUAL TO 1/10 OF THE RAT-
ED CAPACITY OF THE BATTERY AND FOR NOT LONGER THAN 8 HOURS TAKE
THE VEHICLE TO AN AUTHORISED PIAGGIO-GILERA SERVICE CENTRE FOR
THIS OPERATION. WHEN REFITTING THE BATTERY MAKE SURE THE LEADS
ARE CORRECTLY CONNECTED TO THE TERMINALS.
43
3 Maintenance
Summary of Contents for RCR 50
Page 4: ...4 ...
Page 6: ...6 ...
Page 7: ...SMT RCR 50 Chap 01 Vehicle 7 ...
Page 8: ...01_01 8 1 Vehicle ...
Page 17: ...01_22 17 1 Vehicle ...
Page 18: ...18 1 Vehicle ...
Page 19: ...SMT RCR 50 Chap 02 Use 19 ...
Page 27: ...SMT RCR 50 Chap 03 Maintenance 27 ...
Page 50: ...50 3 Maintenance ...
Page 51: ...SMT RCR 50 Chap 04 Technical data 51 ...
Page 52: ...04_01 52 4 Technical data ...
Page 56: ...56 4 Technical data ...
Page 57: ...SMT RCR 50 Chap 05 Spare parts and accessories 57 ...
Page 58: ...58 5 Spare parts and accessories ...
Page 59: ...SMT RCR 50 Chap 06 Programmed maintenance 59 ...
Page 66: ...66 6 Programmed maintenance ...