Page 5-1
VaporTEK Start-up Required Equipment
VaporTEK Calibration Start-up Sequence
MDE-5394B VaporTEK™/VaporTEK-3 Controller Board 110 V UL® Vapor Recovery Collection System for Encore® 500 S
Start-Up and Service Manual · March 2019
5 – VaporTEK Calibration Start-up Sequence
The start-up procedures for the VaporTEK system are as follows:
• Required equipment (refer to
“VaporTEK Start-up Required Equipment”
).
• Programming for vapor recovery (refer to
“Programming Pump 02.8.86 or Later for
on
• External flow meter calibration (refer to
“External Flow Meter Calibration”
on
• Pulse rate setup with FB1 terminal (refer to
“Pulse Rate Setup with FB1 Terminal”
on
• System integrity test (refer to
on
).
• System calibration (refer to
VaporTEK Start-up Required Equipment
The following are the required equipment for the initial setup:
Description
Part Number
Burkert Flow Meter with Elaflex-style Nozzle Adapter, and Rubber Hose between Adapter
and Meter.
M13351A001
FB1 Handheld Terminal (includes 15-pin to RS-422 cable supplied with unit).
M13353A001
Nozzle Adapter to collect vapor (varies with nozzle manufacturer) for Gilbarco Veeder-Root
Asian Veeder-Root Nozzle (AVRN)/ICVN and OPW 12VW.
Note: Only the correct adapter can be used for system calibration.
579290-001
(Veedor-Root PN)