Page 5-11
System Calibration
VaporTEK Calibration Start-up Sequence
MDE-5394B VaporTEK™/VaporTEK-3 Controller Board 110 V UL® Vapor Recovery Collection System for Encore® 500 S
Start-Up and Service Manual · March 2019
6
Open the vapor valve on the AVRN by depressing the lever and inserting a pin in the location
shown in
.
Note: For methods on how to open the nozzle vapor valve on non-Gilbarco Veeder-Root
nozzles, refer to the manufacturer’s manual.
The following table lists the FB1 terminal key descriptions
:
Figure 5-19: System Calibration Setup Diagram
Ensure that the nozzle vapor valve is open and the external meter is connected
(see
).
Key
Description
START
Power ON the FB1 terminal
ENTER
Confirm selection
SHIFT
Cancel selection
Connect vapor flow
meter to barbed
fitting on adapter
AVRN
Nozzle Hold-open Clip
Pin
Vapor Collection Holes
O-ring (2X)
Nozzle Shutoff Port (do not cover)
Nozzle Hold-open Clip
Gas Meter
Connector vapor
flow meter to barbed
fitting on adapter
Elaflex-style Nozzle
Tighten
Ring (2X)
Air
Flow
Encoder Cable
FB-1
Handheld
Terminal
15 Pin RS-422 Connector Cable