61
SECTION 6 - APPENDICES
6
MDE-5222F
UPM Cabling
Ensure that the UPM cables are connected as follows:
1
P1 port is connected to 24 V Power Cable (M14340A001).
2
P2 port of Softkey Cable (M13119AXXX) is connected to the softkeys, P213 of PIP3 for the beeper,
J2111 for the door node, and J192 for the door switch.
3
P3 port of Ethernet Cable (Q13850-XX) is connected to P303A/B on AFP board.
4
P4 port of USB Cable (M03695B007) is connected to USB UPLINK on PIP3 board.
5
P5 port of LVDS Cable (M14136A00X) is connected to P205 on PIP3 board.
6
P6 port of LVDS Cable (M14338A001) is connected to P606A/B on UPM board.
7
Earth Ground Cable (M04431A002) is connected to the U-channel running across the bottom of the
unit cavity. These need to be mounted with separate bolts and not together.
Intercom System
Ensure that the intercom system is connected as follows:
1
Speaker Cable (M09259A002) is connected to the speaker located on door.
2
Intercom Cable (M11870A003) is connected to P505 port on side A and side B.
3
Red and white (S and Speaker -) cables coming from the conduit are connected to the
intercom system.
4
J411 on the 24 V power cable connects to P220 on PIP3 board. The existing PIP3 power cable connects
to P411A.
You must depress and hold the tab on the side of the UPM softkey connector to
remove it. If you do not depress the tab, you are very likely to pull out the wire from
the connector.
CAUTION
Summary of Contents for FlexPay IV CRIND
Page 2: ...This page is intentionally left blank...
Page 8: ...MDE 5222F 4 SECTION 1 INTRODUCTION 1 This page is intentionally left blank...
Page 50: ...MDE 5222F 46 SECTION 4 INSTALLATION 4 This page is intentionally left blank...
Page 59: ...55 SECTION 6 APPENDICES MDE 5222F 6 Figure 7 Cable Block Diagram for FlexPay IV DCM2 2...