![Gifas-electric MarkLED 4 Installation Instructions Manual Download Page 7](http://html.mh-extra.com/html/gifas-electric/markled-4/markled-4_installation-instructions-manual_2222449007.webp)
MarkLED 4
Page 7 / 38
Created
03.10.2017
chal
Modified
28.11.2017
chal
Object-ID
850593
3 Required tools
3.1 Standard tool
Drill hammer
Concrete drill ø10 mm and ø 40mm
Pliers to cut off cables
Light barping pliers for system cables 2x2,5mm²
Hot-air gun
Compressed air for cleaning the groove and the bores
Hand press for 310ml cartridges
In order to ensure the correct polarity and thereby the function as
early as the installation stage, we recommend using a supply volt-
age of 24VDC when connecting to the connection cables (if neces-
sary, a 24V battery can also be used).