Foundation box
Á
Motor unit
Â
Limit switch unit
Ã
Rod and output lever unit
Ä
Support lever and leaf release unit
Å
Cover
1)
.
[ ]
2)
4
.
3)
.
4)
.
Based on the type of structure and desired opening, decide on the exact position for the operator following the
type indications
If not yet fitted, apply a closing and opening end-stop
[ ]
Dig a foundation hole in the appropriate position and large enough to fit the operator
7
[ ]
Provide for a water drain to prevent stagnation and subsequent oxidation in the foundation box
9
INSTALLATION
DESCRIPTION [ ]
5
Check that the gate structure is in conformity with the regulations in force and that the gate movement is linear without
friction.
Preliminary checks
• Check that the gate structure is sufficiently robust. In any case check that the gate weight and dimensions fall
within the operating limits of the operator.
Maximum leaf length:
2.5 m - maximum weight: 600 kg
3.5 m - maximum weight: 400 kg (it is recommended to use an electric lock).
• Check that the leaf can be moved manually without force (points of greatest friction) for the entire travel of the gate
during both opening and closing.
• Maximum cable length 10 m.
• Check that the area where the gearmotor will be fitted is not exposed to flooding.
• If the gate is not a new installation, check the state of wear of all the components, repair or replace the defective or
worn parts and perform any other operations necessary.
• Check that the mechanical end-stops have been fitted.
The reliability and safety of the automated device is directly dependent on the condition of the gate structure.
:
PRELIMINARY WARNINGS
GROUND
20
Summary of Contents for GROUND 610
Page 4: ...GROUND 4 9 7 8 6 5 72 mm 35 mm 200 mm 400 mm 500 mm 6 5 3 4 2 1...
Page 5: ...GROUND 11 13 14 10 12 min 10 mm C 250 mm min 40 mm C PULL 5...
Page 8: ...GROUND 8 20 21...
Page 9: ...6 5 3 4 7 3 5 1 2 4 7 4 3 6 5 1 2 GROUND 22 24 25 23 9...
Page 43: ...GROUND 43 NL...
Page 50: ...GROUND 50 NOTE NOTES...
Page 51: ...GROUND 51 NOTE NOTES...