There must not be obstacles of any kind in the range of action of the operator.
•
The foundation plinth must be laid in an area free of cables and ducts and such as to guarantee adequate hold of
the plinth.
Check that there is an efficient earth plate for connection of the upright.
Carry out the installation far enough away from the road so that it does not constitute a danger for
circulation.
The motorized boom entrance is mainly intended for vehicle passage; if possible, make a separate entrance for
pedestrians.
It is advisable to post clearly visible warning signs at the automated entrance (inside and out) and, if necessary,
indicate that pedestrians are not allowed to pass through.
If you have any doubts about the safety of the installation, suspend work and contact your dealer.
Check for any medium- and high-voltage overhead cables in the place of installation and respect the minimum
overhead clearance.
•
•
•
•
•
•
Ensure that the foundation plate is positioned in such a way as to guarantee proper operation of the operator and
easy access for the subsequent installation phases or future maintenance.
1 -
Assemble the foundation plate
(8)
.
2 -
Lay a foundation plinth
(9)
including one or more tubes of adequate diameter to run the cables through.
Check that the foundation plate is level using a spirit level.
1 -
Undo the six side screws to remove the front cover
(10)
.
2 -
Position the operator on the foundation plate and secure it with the four nuts and washers provided on the
foundation plate
(11)
.
Define whether the installation is RIGHT or LEFT
(12)
.
3 -
Once you have defined the installation as right of left, if necessary, move the balancing device which will house
the spring/s (not provided with the operator).
In case of left installation, the balancing device is on the left.
In case of right installation, the balancing device is on the right.
The operator is always supplied with the balancing device fastened on the right, therefore in the case of right
i
installation, the balancing device does not have to be moved.
Follow the
RIGHT-LEFT Boom Conversion
procedure to move the balancing device.