7

 

Mechanical installation 

Requirements 

The permissible loads on walls, mountings, connection and transmission elements must not 
be exceeded even for maximum holding or locking torque (▶ observe technical data). 
 
Connection elements 

 

Use self-locking 
connection elements with 
a minimum strength of 
800 N/mm

2

 (8.8). 

 

Use a screw that 
precisely fits the hole. 

 

Use adequately 
dimensioned washers for 
elongated holes. 

BAGAB00002_Z002

BAGAB00003_Z002

3 : 1

 
Permissible mounting positions 

+

BAGAC04005_Z001

 

Summary of Contents for SI 80.12-55,00 Ex

Page 1: ...f Installation Instructions ELEKTROMAT SI 80 12 55 00 Ex Model 10002639 00001 en Status 22 11 2019...

Page 2: ...2 GfA ELEKTROMATEN GmbH Co KG Wiesenstra e 81 D 40549 D sseldorf www gfa elektromaten de info gfa elektromaten de...

Page 3: ...tion of the motor 19 11 Limit switch connection 19 12 Emergency manual operation emergency hand crank 20 13 Completion of commissioning testing operation 22 14 Declaration of conformity Motor 27 15 De...

Page 4: ...sks are to be performed by skilled personnel only Only trained electrical craftsmen are permitted to work on electrical equipment They must assess the tasks assigned to them recognise potential danger...

Page 5: ...for frequency inverter operation 12 rpm Supply voltage 3 400 V Operating current 2 70 A Operating frequency 50 Hz Power factor cos 0 76 Maximum movements per hour 12 h 1 Manual force emergency manual...

Page 6: ...5F 123 T4 Manufacturer GfA Explosion protection II 2G Ex h IIC T4 Gb II 2D Ex h IIIC 130 C Db Max output torque 800 Nm Max output speed 15 rpm Shaft centre distance 115 mm Transmission ratio 1 123 Tem...

Page 7: ...ting current 4 68 2 70 A Operating frequency 50 Hz Power 1 1 kW Power factor cos 0 76 Motor speed 1430 rpm Motor torque 7 3 Nm Operating mode S1 Protection class IP 65 Temperature class T4 PTC resisto...

Page 8: ...6 20 40 T5 20 55 C Protection class IP 66 6 Technical data of limit switch emergency manual operation switch Type 07 2511 113061G Manufacturer Bartec Explosion protection II 2G Ex d IIC T6 II 2D Ex tD...

Page 9: ...ven for maximum holding or locking torque observe technical data Connection elements Use self locking connection elements with a minimum strength of 800 N mm2 8 8 Use a screw that precisely fits the h...

Page 10: ...k the atmosphere for explosion hazards before commencing installation tasks Mounting 2 elongated holes are provided for mounting Installation in the vertical position is only permitted with an additio...

Page 11: ...her defined The door manufacturer s specifications must also be observed Warning Injury or danger to life possible Use a lifting device with sufficient load carrying capacity for installation tasks Co...

Page 12: ...ten all connection elements M16 with a torque of 175 Nm Install all further connection elements according to the specifications of the door manufacturer BAGAE04009_Z001 8 8 175 Nm 8 8 Variant Lift the...

Page 13: ...drive unit BAGAE4010_Z001 Variant Tighten all connection elements M16 with a torque of 175 Nm Install all further connection elements according to the specifications of the door manufacturer BAGAE401...

Page 14: ...ect the cables mains OFF and check that the supply is off Observe the applicable regulations and standards Ensure proper electrical connection Use suitable tools Carrying out the electrical installati...

Page 15: ...meproof motors d it must be equipped with a separate evaluation unit The evaluation unit measures the temperature of the motor coil and deactivates the motor as soon as the preset temperature is excee...

Page 16: ...that the flameproof enclosure is closed In order to achieve the required tightness the cable glands are equipped with different sealing inserts They are available for the following cable diameters 5...

Page 17: ...by pressing the OPEN push button of the control If the door closes L1 and L2 must be swapped in a de energised state Setting of OPEN final limit position Open to the desired OPEN final limit position...

Page 18: ...1 EMERGENCY OPEN limit switch is preset by the setting of the OPEN final limit position The door must stop without posing any risks should the rotating direction be incorrect or should there be a faul...

Page 19: ...resistor R2 PTC resistor R3 PTC resistor Y1 Spring loaded brake 11 Limit switch connection S10 Manual operation X12 Terminal rail S1 Safety open limit switch S2 Safety close limit switch S3 Open limit...

Page 20: ...the emergency manual operation must be carried out against the closed brake Warning Danger of the door dropping If you need to apply more than the permissible force of 390N according to DIN EN 12604...

Page 21: ...21 Plug in the crank and turn until it engages Open or close by turning the crank After use the crank may be attached to the drive unit Attach as illustrated...

Page 22: ...ires no maintenance or inspection Warning Danger of the door dropping In the case of a gearbox damage the internal safety brake is triggered to prevent the door from dropping The gearbox stalls Releas...

Page 23: ...only between final limit positions Limit switches Check the final limit positions by opening and closing the door completely The safety zone must not be reached Brake Warning Injury or danger to life...

Page 24: ...adequately short intervals should these be unavoidable due to operation processes Performed cleaning tasks should be documented Note Have the drive checked annually by a specialist Shorter inspection...

Page 25: ...ve directive and that no new hazards arise from their assembly The assembled modules are intended only for installation in a door system Drive unit SI 80 12 55 00 Ex Part no 10002639 00001 Consisting...

Page 26: ...the product according to Directive II 2G Ex h IIC T4 Gb II 2D Ex h IIIC 130 C Db Notified body pursuant to Directive T V Nord Anlagetechnik GmbH Am T V 1 30519 Hannover Deutschland Registration number...

Page 27: ...27 14 Declaration of conformity Motor...

Page 28: ...28 15 Declaration of conformity Accessories...

Page 29: ...29...

Page 30: ...d complies with the provisions of the above mentioned directives Authorised representative to compile the technical documents is the undersigned D sseldorf 10 08 2018 Stephan Kleine CEO Signature The...

Page 31: ...31...

Page 32: ...32...