GEZE Slimdrive SLT Installation And Service Instructions Manual Download Page 7

Slimdrive SLT product family

7

Overview

Overview

4.1  Diagrams

Number

Type

Name

70487-0-007

Drive drawing

Slimdrive SLT, drive

70487-0-010

Dimensioned drawing

Slimdrive SLT/SLT-FR 2M

, 4-leaf with rod locking

70487-ep01

Installation diagram

Slimdrive SLT / -FR 2 M, insulated glass doors, post-rail construction

70487-ep06

Installation diagram

Slimdrive SLT with floor lock

70487-ep07

Installation diagram

Slimdrive SLT/SLT-FR 2M

 with IGG

70487-ep10

Installation diagram

Slimdrive SLT/SLT-FR 2M

 ISO, Lock M, post-rail

70487-ep20

Installation diagram

IGG profile system

70487-ep21

Installation diagram

2-leaf, left-hand side, 1-leaf, left hand slide to open

70487-ep22

Installation diagram

2-leaf, right-hand side, 1-leaf, right hand slide to open

70487-ep27

Installation diagram

Wooden leaf

70487-ep40

Installation diagram

ISO with rod locking

70715-9-9818

Installation diagram

Continuous floor guide SL + SLT

70484-ep04

Installation diagram

Safety leaf for sliding door drives

70484-ep15

Installation diagram

Protective leaf mounting

70717-ep02

Installation diagram

Slimdrive SLT, ISO self-supporting girder section

70717-ep04

Installation diagram

Slimdrive SLT, girder section lintel installation

70717-ep08

Installation diagram

Slimdrive SLT, self-supporting girder section Lock M

70717-ep09

Installation diagram

Slimdrive SLT, girder section lintel installation Lock M

70484-2-0572

Component drawing

Cover, bespoke SL/SLT

70484-2-0574

Component drawing

Track, bespoke 

70484-2-0467

Component drawing

Track 6500 and 4500 mm - 2-leaf - with rod locking

70484-2-0575

Component drawing

Track, bespoke - 2-leaf - with rod locking 

70484-2-0691

Component drawing

Track, bespoke - 1-leaf - with rod locking 

70715-1-0159 

Assembly group drawing

Floor guide continuous

70715-9-9837

Installation drawing

SLT insulated glass leaf

70717-9-0967

Installation drawing

SL/ SLT side panel

The diagrams are subject to change without notice. Use only the most recent version.

4.2  Tools and aids

Tool

Closer size

Tape measure
Marking pen
Torque spanner
Allen key

2 mm, 2.5 mm, 3 mm, 4 mm, 5 mm, 6 mm

Open-ended spanner

8 mm, 10 mm, 13 mm, 15 mm, 13 mm flat (GEZE specialised tool)

Ring spanner

8 mm

Screwdriver set

Floor guide slit up to 6 mm, cross-slot PH2 and PZ2

Torx key

TX 20 (bit insert length at least 110 mm)

Side-cutting pliers
Crimping pliers for cables
Wire stripper
Multimeter
Display programme switch/Service terminal ST 220/GEZEconnects

Summary of Contents for Slimdrive SLT

Page 1: ...Slimdrive SLT Product family EN Installation and service instructions 192483 01...

Page 2: ...the floor guide 11 5 4 Installing the moving leaf 12 5 5 Fitting the tooth belt 19 5 6 Setting the stop buffer 22 5 7 Installing cable guides 22 5 8 Fitting the transformer ground 23 6 Production test...

Page 3: ...ersion 01 valid for Slimdrive SLT product family from date of manufacture 2021 1 3 Product liability In compliance with the liability of the manufacturer for his products as defined in the German Prod...

Page 4: ...work must be performed by properly trained personnel authorised by GEZE The country specific laws and regulations are to be observed during safety technology tests If unauthorised changes are made to...

Page 5: ...glass breakage Always only use safety glass Risk of injury due to sharp edges on the drive and door leaf Risk of injury during installation through freely moving parts 2 4 Environmentally conscious wo...

Page 6: ...the girder section installation is described in the instal lation instructions Girder section with side panel The following drawings illustrate installation with ISO profile systems The IGG profile is...

Page 7: ...r section 70717 ep04 Installation diagram Slimdrive SLT girder section lintel installation 70717 ep08 Installation diagram Slimdrive SLT self supporting girder section Lock M 70717 ep09 Installation d...

Page 8: ...l protective earth connections X X Secure workplace against unauthorised entry X X Always work with a second person X X Use a stepladder or stepstool with test seal X X Keep inside area of track clean...

Page 9: ...t side of the mounting profile 2 and transfer the cable feed through X X Remove the mounting profile X X Drill fastening holes 1 into the mounting profile X X Cut out mounting profile 2 in the marked...

Page 10: ...ail version X X Position inner 5 clamping strips 2 at the level of the inner posts and position others between them Wall and ceiling installation X X Mount the cap with side plate see pre in stallatio...

Page 11: ...ntersunk head screws 3 and 2 1 Countersunk screw for moving leaf left hand slide to open 2 Countersunk screw 3 Countersunk screw for moving leaf right hand slide to open 4 outside 5 inside 6 Angled fl...

Page 12: ...ing leaves must be dismantled see installation instructions for moving leaves See the installation drawing for the moving leaf for the position of the bracket support distance x y and overhang Install...

Page 13: ...nnecting arm and long driver X X Use 2 hexagon screws 5 to screw the long driver 6 to the inner left moving leaf torque 15 Nm X X Clamp the connecting arm 3 in place using 2 setscrews 4 torque 3 Nm In...

Page 14: ...g the moving leaves WARNING Risk of injury caused by moving leaf falling over The moving leaves are very heavy X X At least 2 people should work together to set up the moving leaf WARNING Risk of inju...

Page 15: ...leaf into open position approx 20 mm 6 2 5 2 X X Position suspension piece 2 on the track approx 20 mm from the centre axis of the long rope pulley 6 and clamp in position X X Thread in the wire rope...

Page 16: ...and clamp tightly X X Undo the fixing screws of the clamping piece 3 while at the same time with the help of a screwdriver push the clamping piece 3 to the left and tighten the wire rope slightly X X...

Page 17: ...t 1 Adjusting the inclination and level of the moving leaves X X Adjust the inclination and level of the moving leaves using the hex of the suspension bolts 2 Horizontal adjustment of the moving leave...

Page 18: ...strip with brush into the moving leaf until it snaps into place see the assembly drawing for the Slimdrive SL moving leaf X X Mount the guide rails in the floor area see the assembly drawing for the S...

Page 19: ...t 1 leaf X X Screw the toothed belt locking 2 on the short driver 1 torque 10 Nm 2 leaf X X Screw the toothed belt locking 2 on the short driver 1 torque 10 Nm X X Fix the toothed belt locking 1 on th...

Page 20: ...h a way that a slot head screwdriver can be pushed between the sliding block and the motor gear unit X X Tighten the screw 1 torque 10 Nm X X Push the slot head screwdriver into the gap and lever it u...

Page 21: ...an be locked and unlocked X X If necessary enlarge the drill hole X X Tighten screws 1 X X Adjust the locking guide 4 so that the tooth belt neither touches nor has too much clearance To do this loose...

Page 22: ...setscrew 2 on the stop buffer 1 X X Slide the moving leaf to the open position X X Slide the stop buffer 1 on the roller carriages X X Tighten the setscrew 2 using the Allen key torque 3 Nm 5 7 Insta...

Page 23: ...g rail 3 and track X X Check whether the setscrews of the earthing rail 3 penetrate the anodised layer of the track The transformer must be positioned according to the drawing so that it covers the tr...

Page 24: ...uctor test in accordance with VDE 0100 Part 600 X X Remove the sheath of the mains cable 4 on a max of 40 mm 3 2 9 mm PE 9 mm max 30 mm 10 mm 4 X X Strip the mains cable 4 Sheath removal length 40 mm...

Page 25: ...t locking mechanism optional 6 3 Mounting the cover suspension piece X X Insert the suspension pieces 1 for the cover catch cable into the front groove on the right approx 1 cm from the edge of the tr...

Page 26: ...e mounted suspension pieces 1 of the cover 4 6 3 1 Fitting the cover earthing X X Knock the locating pin for the cover earthing 1 on the side of the earthing approx 30 mm into the upper screw duct app...

Page 27: ...r fixing bracket 1 and fix on a sliding block using locking screw M6 x 16 hexagon socket locking screw torque 15 Nm X X Distribute the cover fixing brackets evenly on the track depending on the space...

Page 28: ...de panels 2 until it latches in and ensure that it is also seated correctly in the area of the track and cable guides X X Check the correct position of the cover safety ropes 1 and the earthing wire T...

Page 29: ...nd outputs and on commissioning please refer to the wiring diagram 6 6 1 Creating a log book X X Carry out a safety analysis X X Record installed options in the safety analysis for the operator 6 7 Di...

Page 30: ...ase of wear or damage Rubber cable In case of wear or damage Pulleys for rubber cable In case of wear or damage After completing the maintenance work always execute the learning function for the door...

Page 31: ...pulley and replace if necessary 8 2 Replacing roller carriage WARNING Risk of injury caused by moving leaf falling over The moving leaves are very heavy X X At least 2 people should work together to...

Page 32: ...isconnect the door system from the 230 115 V mains supply on site before removing the PCB cover 1 and secure against being switched back on again X X You will find the fuse value on the wiring diagram...

Page 33: ...tion 2 Connection to external safety systems which have been approved by the drive manufacturer 3 Low energy Note Several classes may be marked Safety on the automatic door system version installation...

Page 34: ...r ground fitted 5 8 23 12 Ground connection established 6 3 1 26 13 230 115 V connection established 6 1 24 14 Cover earthing connected 6 3 1 26 15 Supports for cover installed 16 Cover safety ropes f...

Page 35: ...Slimdrive SLT product family 35...

Page 36: ...geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office india...

Reviews: