
Slimdrive SLT product family
11
Installation
5.3 Mounting the floor guide
à
The floor guide is selected based on the on-site conditions. One of the following floor guide options must be used.
à
For further information see the respective installation drawing, Chapter 4.1.
5.3.1 Angled floor guide, floor mounting (option)
Angled floor guide with moving leaf left hand slide to open
X
Screw in the angled floor guide (6) with 2 suitable countersunk
head screws (1) and (2).
Angled floor guide with moving leaf right hand slide to open
X
Screw in the angled floor guide (6) with 2 suitable countersunk
head screws (3) and (2).
1
Countersunk screw for moving leaf left hand slide to open
2
Countersunk screw
3
Countersunk screw for moving leaf right hand slide to open
4
outside
5
inside
6
Angled floor guide
5.3.2 Adjustable angled floor guide wall installation (option)
X
Screw the fastening bracket (2) onto the fixed
panel (1) using two screws (6) (tightening
torque 10 Nm).
X
Align the moving leaf (4) and thereby the
adjusting angle (3).
X
Tighten the screw (5).
X
If there is no fixed panel, mount the floor
guide onto the wall using suitable attachment
materials.
1
2
3
4
5
6
5.3.3 Continuous floor guide (option)
à
For assembly of the continuous floor guide, see the “Continuous floor guide” assembly drawing.
à
For further information see the respective installation diagrams, Chapter 4.1.