
5.3 Run sterilization program
5.3.1 THREE TIMES PRE-VACUUM PROGRAM
(
HOLLOW PRION COTTON
)
C
lick
“
start
”
botton of Fig.5.3-1 interface,the sterilization program will be started and enter into Fig.5.3-2 or Fig.5.3-3 interface.
When temperature of heating coil(T3) rised and less than 100
℃
,Screen will show Fig.5.3-2 interface (the heating coil pre-heating stage).
When temperature of heating coil(T3) rised and over than 100
℃
,Screen will show Fig.5.3-3 interface (the first times pre-vacuum stage).
Click
“
”
to check T3 temperature.(Fig.5.3-4)
5.3.1.1.THE FIRST TIMES PRE-VACUUM STAGE(Fig.5.3-3)
when the T3 temperature over than 100
℃
,the sterilizer will start evacuating and the control system will open the vacuum pump
solenoid valve(Ev4).LCD shows
“
00:03:59
”
time countdown.If the vacuum value reaches Pv value ahead of time, sterilization
program goes into heating stage in advance.
ATTENTION:If the vacuum value of less than Pv (factory default setting Pv=-0.800bar) in
“
00:03:59
”
, there will be with alarm E12.
Fig.5.3-1 Fig.5.3-2 Fig.5.3-3 Fig.5.3-4
5.3.1.2.THE FIRST TIMES HEATING STAGE(Fig.5.3-5)
When the vacuum value reachs Pv value,the contrl system will open the water pump-solenoid valve(Ev2).The steam generator start to inject the
steam into chamber.The temperatures(T1 and T2) and pressure inside the chamber will be rised at the same time.
5.3.1.3.THE FIRST TIMES EXHAUST STAGE(Fig.5.3-6)
When the pressure inside the chamber reachs 1.100bar,the control system will open the exhaust-solenoid valve(Ev1) for exhausting untill pressure
downs to P=0.000bar.LCD shows
“
00:01:29
”
time countdown.
5.3.1.4.THE SECOND TIMES PRE-VACUUM STAGE(Fig.5.3-7)
When the pressure inside the chamber downs to 0.000bar,the control system will open the vacuum pump-solenoid valve(Ev4) and start evacuating.
LCD shows
“
00:03:59
”
time countdown.it the vacuum value reaches -0.700bar ahead of time, sterilization program goes into heating stage in advance.
5.3.1.5.THE SECOND TIMES HEATING STAGE(Fig.5.3-8)
Page 30 of 58
Summary of Contents for JN-23
Page 1: ...EURO CERT 1128 0197 English JN 23 MODEL SteamSterilizer InstructionManual CLASS B and S ...
Page 4: ...Page 03 of 58 ...
Page 5: ...Page 04 of 58 ...
Page 7: ...Page 06 of 58 ...
Page 8: ...Page 07 of 58 ...
Page 10: ...Page 09 of 58 JN 23 overall space required ...
Page 12: ...Page 11 of 58 ...
Page 13: ...Page 12 of 58 ...
Page 14: ...Page 13 of 58 ...
Page 40: ...Page 39 of 58 ...
Page 41: ...Fig 6 2 1 Fig 6 2 2 Fig 6 2 3 Page 40 of 58 ...
Page 42: ...Fig 6 2 4 Fig 6 2 5 Fig 6 2 6 Chapter 4 3 2 Chapter 4 3 2 Page 41 of 58 ...
Page 43: ...6 2 1 Periodic Maintenance Page 42 of 58 ...
Page 44: ...6 3 Extraordinary Maintenance Page 43 of 58 ...
Page 51: ...Page 50 of 58 ...
Page 52: ...134 04min 15min 3 134 18min 15min 3 121 20min 15min 3 Page 51 of 58 ...
Page 53: ...Page 52 of 58 ...